| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209826 | Project ID: 209826 DEA: 041J6604 EFIS: 0414000319 | 04-SM-1,001-38.0/38.6 | Install Bay Area Security Enhancement System | Near Pacifica, near Pacifica, at the Tom Lantos Tunnels Br # 35-0330L/R | 12/27/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 214461 | Project ID: 214461 DEA: 050N7024 EFIS: 0518000113 | 05-SB-101-4.6 to 7.5 | CMGC project to extend HOV lanes, reconstruct interchange and widen bridges. | Near Padaro on route 101. | 09/26/2022 | 1 (02/21/2020) | Details CEM-3701 Report |
| 7302 | Project ID: 7302 DEA: 010C1904 EFIS: 0112000233 | 01-DN-199-24.67 | Repair Slipout | Near Patrick Creek at 0.6 mile north of Middle Fork River Br | 02/11/2013 | 1 (03/28/2012) | Details CEM-3701 Report |
| 2175 | Project ID: 2175 DEA: 042G3204 | 04-SM-1-13.4 | Install Rock Slope Protection | Near Pescadores, at 0.2 mile south of Pescadores Road | 08/31/2012 | 1 (08/31/2012) | Details CEM-3701 Report |
| 210120 | Project ID: 210120 DEA: 010E9204 EFIS: 0115000046 | 01-MEN-101-104.25 | Culvert Failure - repair drainage and slip out | Near Piercy at 0.42 mile North of Bridge # 10-91 and 2.32 mile south of South Fork Eel River Bridge # 10-218 | 04/27/2018 | 1 (01/13/2015) | Details CEM-3701 Report |
| 211109 | Project ID: 211109 DEA: 060T5204 | 06-TUL-99-6.0/13.0 | Slab replacements | Near Pixley, from 0.2 mile South of the Ave 48 OC to 0.2 miles North of the Ave 100 OC | 08/02/2023 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213398 | Project ID: 213398 DEA: 034E6200 EFIS: 0314000039 | 03-ED-50-21.9-24.5 | Camino Safety Project | Near Placerville and Camino from 0.2 mile west of Still Meadows Road to 0.4 mile east of Upper Carson Road | 1 (01/08/2019) | Details CEM-3701 Report | |
| 215697 | Project ID: 215697 DEA: 07318204 EFIS: 0715000286 | 07-LA-Route 1-4.0/4.2 | CM/GC Project - Work consists of constructing secant wall and slope restoration | near Point Mugu State Park 0.4 mile South of Sycamore Canyon Road. | 1 (08/26/2021) | Details CEM-3701 Report | |
| 7507 | Project ID: 7507 DEA: 060M9604 EFIS: 0600020398 MINOR: 06A1763 | 06-TUL-190-11.41 | Install Flshing Beacons | Near Porterville at Intersection of Rte 190 and 208 | 10/16/2020 | 2 (12/05/2014) | Details CEM-3701 Report |
| 10057 | Project ID: 10057 DEA: 051A9304 EFIS: 0512000042 | 05-SBT-101-.7 | Stabilize and Reconstruct Slope | Near Prunedale at .2 mile north of Cole Rd | 08/27/2018 | 1 (01/04/2016) | Details CEM-3701 Report |