Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13761-13770 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213786 | Project ID: 213786 MINOR: 09A0724 | 09-KER-178-78.9/79.2 | Construct Midwest Guard Rail and Place Roadside Signs | In Kern County | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 1001605 | Project ID: 1001605 DEA: 114B0044 EFIS: 1122000173 | 11-SD-5-54-9.5,0.0/6.4 | Construct Middle Mile Broadband Network. | IN SAN DIEGO COUNTY IN AND NEAR SAN DIEGO, NATIONAL CITY, AND CHULA VISTA ON ROUTE 5 AT 0.1 MILE NORTH OF SWEETWATER RIVER BRIDGE AND ON ROUTE 54 FROM ROUTE 5/54 SEPARATION TO 0.4 MILE EAST OF SWEETWATER ROAD UNDERCROSSING | 1 (09/18/2025) | Details CEM-3701 Report | |
| 994375 | Project ID: 994375 DEA: 041Y4104 EFIS: 0422000482 | 04-SCL-17-0.0/13.9 | Construct Middle Mile Broadband Network | On State Highway in Santa Clara County in and near Los Gatos, Campbell, and San Jose from the Santa Cruz County line to route 17/280 separation. | 1 (02/06/2023) | Details CEM-3701 Report | |
| 7660 | Project ID: 7660 DEA: 041SS604 EFIS: 0412000640 | 04-ALA-13-9.0 | Construct Micropile wall and slope stressing system | In Oakland, 0.1 mile south of Broadway Terrace | 09/28/2016 | 1 (08/20/2012) | Details CEM-3701 Report |
| 1001002 | Project ID: 1001002 DEA: 09396904 EFIS: 0924000027 | 09-MNO-395-106.3/108.0 | CONSTRUCT MICRO-SURFANCING AND PLACE DELINEATION. | MONO COUNTY AT WALKER FROM EAST SIDE LANE TO 0.5 MILE NORTH OF HACKNEY DRIVE | 09/25/2025 | 1 (04/09/2025) | Details CEM-3701 Report |
| 1875 | Project ID: 1875 DEA: 041A6504 | 04-SON-101-2.6/R49.3 | CONSTRUCT METAL BEAMGUARD RAILING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report | |
| 7279 | Project ID: 7279 DEA: 023C3004 EFIS: 0200000317 | 02-PLU-70-0.6/35.2 | CONSTRUCT METAL BEAM GUARDRAIL, CONCRETE BARRIER AND RETAINING WALLS. | PLUMAS COUNTY AT VARIOUS LOCATIONS FROM GRIZZLY CREEK BRIDGE TO 0.1 MILE WEST OF SPANISH CREEK BRIDGE | 12/05/2014 | 1 (08/01/2012) | Details CEM-3701 Report |
| 213800 | Project ID: 213800 DEA: 051J5904 EFIS: 0518000002 MINOR: 05A2072 | 05-SBT-154-23.8/27.4 | Construct Metal Beam Guard Rails | FOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY NEAR SANTA BARBARA AT 0.6 MILE WEST OF CAMINO CIELO AND AT 0.7 MILE EAST OF PAINTED CAVE ROAD. | 1 (12/07/2018) | Details CEM-3701 Report | |
| 7575 | Project ID: 7575 DEA: 051A1804 EFIS: 0500020279 MINOR: 05A1537 | 05-SLO-41-43.9/49.6 | Construct metal beam guard railing in San Luis Obispo County | At various locations about 1.0 mile south of the San Luis Obispo/Kern County Line | 03/20/2020 | 1 (11/11/2019) | Details CEM-3701 Report |
| 7651 | Project ID: 7651 DEA: 044A3204 EFIS: 0400020505 | 04-SM-101,280-Var | CONSTRUCT METAL BEAM GUARD RAILING AND VEGETATION CONTROL. | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTES 101 AND 280 | 01/17/2014 | 1 (10/15/2012) | Details CEM-3701 Report |
