Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13721-13730 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2835 | Project ID: 2835 DEA: 050R3804 EFIS: 0500020107 MINOR: 05A1414 | 05-MON-1-72.1 | Replace Culvert | Near Carmel from 0.1 mile south of Carmel River Bridge | 03/16/2020 | 1 (11/08/2019) | Details CEM-3701 Report |
| 211097 | Project ID: 211097 DEA: 030G1104 EFIS: 0314000077 | 03-BUT-32-R19.0/R23.9 | RUBBERIZED HOT MIX ASPHALT (GAP GRADED) OVERLAY. | NEAR CHICO FROM LA CASTANA DRIVE TONOPEL AVE | 11/28/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
| 213774 | Project ID: 213774 DEA: 100P4104 EFIS: 1013000129 MINOR: 10A1961 | 10-TUO-49-11.4 | SONORA CULVERT REPLACEMENT | Near Chinese Camp at 0.9 mile south of South Jct 108 | 12/30/2022 | 1 (11/15/2018) | Details CEM-3701 Report |
| 1038 | Project ID: 1038 DEA: 032F2504 EFIS: 0300020581 | 03-PLA-80-34.6/34.9 | Remove material, install K rail, cut back slope | Near Colfax from 1.8 mile east of Rte 174/80 Separation to .2 mile west of Long Ravine Bridge | 03/31/2020 | 1 (12/28/2010) | Details CEM-3701 Report |
| 211500 | Project ID: 211500 DEA: 010E8104 EFIS: 0115000032 MINOR: 01A1615 | 01-DN-101-R28.3 | Modify Bridge Rail | Near Crescent City | 12/21/2020 | 1 (06/09/2016) | Details CEM-3701 Report |
| 7410 | Project ID: 7410 DEA: 010C3904 EFIS: 0112000259 | 01-DN-101-15.27 | Repair Slip out | Near Crescent City , 1.45 miles north of Rudisill Rd | 06/23/2014 | 1 (05/02/2012) | Details CEM-3701 Report |
| 7407 | Project ID: 7407 DEA: 010C3804 EFIS: 0112000258 | 01-DN-101-15.27 | Repair Slip out | Near Crescent City 1.45 miles north Rudisell Rd | 01/02/2015 | 1 (04/30/2012) | Details CEM-3701 Report |
| 209845 | Project ID: 209845 DEA: 010C9904 EFIS: 0113000092 MINOR: 01A1478 | 01-DN--27.2/R27.7 | Install Hawk Crosswalk System- INSTALL PEDESTRIAN HYBRID BEACON SYSTEM, ROADSIDE SIGNS, CURB RAMPS, RAISED ISLAND AND PAVEMENT DELINEATION | NEAR CRESCENT CITY FROM BURTCHELL ROAD TO WASHINGTON BOULEVARD OVERCROSSING. | 12/21/2020 | 1 (05/21/2014) | Details CEM-3701 Report |
| 19 | Project ID: 19 DEA: 010A7704 EFIS: 0100020390 | 01-DN-101-21.0/21.5 | Repair Slipout | Near Crescent City from Crushing Creek Viaduct to .5 miles of the viaduct | 04/09/2013 | 1 (03/07/2011) | Details CEM-3701 Report |
| 332 | Project ID: 332 DEA: 01494404 EFIS: 0100000481 MINOR: 01A1162 | 01-DN-101-23.7,R28.4 | Install traffic Monitor Stations at Two Locations | Near Crescent City on Rte 101 in Del Norte County | 11/04/2020 | 1 (01/23/2013) | Details CEM-3701 Report |
