Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13711-13720 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211146 | Project ID: 211146 DEA: 022H4404 | 02-PLU-70-11.27, 11.27 | Remove slide, slope stabilization | Near Belden | 01/08/2019 | 1 (03/15/2016) | Details CEM-3701 Report |
| 7809 | Project ID: 7809 DEA: 024F8404 EFIS: 0213000042 | 02-PLU-70-12.8/16.54 | Remove Debris, install debris racks, improve sumps to prevent culvert clogs | Near Belden at 0.8 mile west of Chip Creek Bridge to North Fork River Bridge | 01/18/2013 | 1 (10/22/2012) | Details CEM-3701 Report |
| 25 | Project ID: 25 DEA: 010A9104 EFIS: 0100020422 | 01-HUM-299-9.42 | Repair Slipout | Near Blue Lake | 04/09/2013 | 1 (04/11/2011) | Details CEM-3701 Report |
| 27 | Project ID: 27 DEA: 010A9604 EFIS: 0100020421 | 01-HUM-299-8.8/9.0 | Repair Slipout | Near Blue Lake | 10/30/2020 | 1 (04/11/2011) | Details CEM-3701 Report |
| 7242 | Project ID: 7242 DEA: 01474414 EFIS: 0112000162 | 01-HUM-299-8.4/8.6 | STABILIZE ROADWAY, REALIGN ROADWAY, IMPROVE DRAINAGE, REPLACE CULVERTS | NEAR BLUE LAKE , AT 1.8 MILE EAST OF BUCKLEY RD. AND 0.1 MILE EAST OF THREE CREEKS RD | 12/19/2014 | 1 (06/11/2012) | Details CEM-3701 Report |
| 33 | Project ID: 33 DEA: 010B6404 EFIS: 0112120146 | 01-HUM-299-8.5 | Repair Slipout | Near Blue Lake @ 1.8 miles east of Buckley Rd. | 10/30/2020 | 1 (09/13/2011) | Details CEM-3701 Report |
| 214207 | Project ID: 214207 DEA: 010J6304 EFIS: 0119000069 | 01-MEN-253-0.0/3.0, 0.0-3.0 | Repair Slip out and Drainage | Near Boonville From The 253/128 Jct to 0.4 miles west of Soda Creek Bridge | 08/03/2020 | 1 (07/15/2019) | Details CEM-3701 Report |
| 1000327 | Project ID: 1000327 DEA: 010P1804 EFIS: 0124000183 | 01-HUM-36-25.4/26 | Little Larabee ELB DO wall | Near Bridgeville | 1 (05/08/2024) | Details CEM-3701 Report | |
| 7386 | Project ID: 7386 DEA: 051A9704 EFIS: 0512000046 | 05-SB-101-55 | REPAIR DAMAGED BRIDGE RAILING | NEAR BUELLTON AT NOJOQUI CREEK BRIDGE #51-75R/L | 10/22/2013 | 1 (07/23/2012) | Details CEM-3701 Report |
| 211158 | Project ID: 211158 DEA: 022H4504 | 02-TRI-299-12.3/12.9 | Repair slipout, slope stabilization | Near Burnt Ranch | 12/21/2020 | 1 (05/20/2016) | Details CEM-3701 Report |
