Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13691-13700 of 17792 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994599 | Project ID: 994599 DEA: 081N1604 EFIS: 0822000106 | 08-SBD-40-R20.0/R28.1 | RHMA, HIGH DENSITY POLYURETHANE INJECTION, AND COLD PLANE AC PVMT. | SAN BERNARDINO COUNTY NEAR BARSTOW FROM 0.3 MILE WEST OF NEWBERRY ROAD OVERCROSSING TO DESERT OASIS REST AREA | 08/30/2024 | 1 (08/14/2023) | Details CEM-3701 Report |
994600 | Project ID: 994600 DEA: 081N1704 EFIS: 0822000107 | 08-SBD-15-R108.0/R115.0 | RHMA, HIGH DENSITY POLYURETHANE INJECTION & COLD PLANE AC PAVEMENT. | SAN BERNARDINO COUNTY NEAR BARSTOW FROM 0.6 MILE NORTH OF CLYDE V. KANE REST AREA TO 0.3 MILE SOUTH OF BIRD DITCH BRIDGE | 08/29/2024 | 1 (07/19/2023) | Details CEM-3701 Report |
994601 | Project ID: 994601 DEA: 09384304 EFIS: 0920000009 | 09-INY-395-114.4/114.9 | HMA (TYPE A), CLASS 2 AGGREGATE BASE, AND STRIPING. | INYO COUNTY NEAR BISHOP FROM SCHOBER LANE TO 0.1 MILE SOUTH OF JAY STREET | 1 (08/02/2023) | Details CEM-3701 Report | |
994602 | Project ID: 994602 DEA: 09392004 EFIS: 0922000036 | 09-INY-395-44.9/50.9,52.9/54.5 | HOT MIX ASPHALT (TYPE-A), SHOULDER BACKING, AND STRIPING. | INYO COUNTY NEAR LONE PINE FROM 1.3 MILES SOUTH OF COTTONWOOD ROAD TO 2 MILES NORTH OF BARTLETT ROAD AND FROM 0.3 MILE SOUTH OF LUBKEN CANYON ROAD TO 1.1 MILES SOUTH OF GOLF COURSE ROAD | 12/22/2023 | 1 (08/02/2023) | Details CEM-3701 Report |
994603 | Project ID: 994603 DEA: 09392404 EFIS: 0922000037 | 09-KER-14,58-Var | HOT MIX ASPHALT (TYPE A), REMOVE ASPHALT CONCRETE PAVEMENT, STRIPING. | KERN COUNTY AT VARIOUS LOCATIONS | 12/22/2023 | 1 (12/22/2023) | Details CEM-3701 Report |
994604 | Project ID: 994604 DEA: 100Y6104 EFIS: 1013000245 | 10-MER-99-24.5/28.2 | REMOVE AND INSTALL GUARDRAILS AND END TREATMENTS. | MERCED COUNTY NEAR ATWATER AT VARIOUS LOCATIONS FROM 1.0 MILE NORTH OF WEST ATWATER OVERHEAD TO 1.4 MILES NORTH OF SULTANA DRIVE OVERCROSSING | 03/22/2024 | 1 (04/18/2023) | Details CEM-3701 Report |
994605 | Project ID: 994605 DEA: 101N5104 EFIS: 1021000203 | 10-SJ-5-R23.9 | REPLACE JOINT SEALS AND PLACE POLYESTER CONCRETE OVERLAY ON BRIDGE. | SAN JOAQUIN COUNTY IN STOCKTON AT WALKER SLOUGH BRIDGE | 12/13/2024 | 1 (04/18/2023) | Details CEM-3701 Report |
994606 | Project ID: 994606 DEA: 101N5204 EFIS: 1021000204 | 10-SJ-5,99,132-Var | REPAIR APPROACH SLAB AND PLACE POLYESTER CONCRETE OVERLAY ON DECK. | SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS | 1 (05/09/2023) | Details CEM-3701 Report | |
994607 | Project ID: 994607 DEA: 101N5504 EFIS: 1022000004 | 10-SJ-5-R13.0,R13.9 | REPLACE JOINT SEALS AND PLACE POLYESTER CONCRETE OVERLAY. | SAN JOAQUIN COUNTY NEAR LATHROP AT PARADISE CUT BRIDGE AND AT PARADISE CUT OVERFLOW BRIDGE | 12/13/2024 | 1 (04/18/2023) | Details CEM-3701 Report |
994608 | Project ID: 994608 DEA: 112N1094 EFIS: 1121000058 | 11-SD-8-R29.2/R43.1 | POLYESTER CONCRETE OVERLAY, METHACRYLATE, & JOINT SEALS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM WEST VICTORIA DRIVE OVERCROSSING TO CORTE MADERA ROAD UNDERCROSSING | 06/11/2024 | 1 (07/10/2023) | Details CEM-3701 Report |