Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13691-13700 of 18758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7376Project ID: 7376
DEA: 010C3104
EFIS: 0112000248
01-HUM-101-86.57Repair CulvertNear Arcata, 0.07 miles north of the 14 Street Overcrossing # 4-24504/09/20131 (04/15/2012)Details CEM-3701 Report
215710Project ID: 215710
DEA: 051N3504
EFIS: 0520000173
05-SLO-101-37.8/46.0, 37.0/46.0Replace concrete pavement with precast concrete panels.Near Atascadero on US 101 from 0.1 mile south of Route 58/10 separation to Traffic Way.09/06/20221 (07/06/2021)Details CEM-3701 Report
208589Project ID: 208589
DEA: 033F4104
EFIS: 0312000283
03-PLA-49,80,193-0.0/0.9REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIER RAIL.NEAR AUBURN AND COLFAX, ON ROUTES 49, 80, AND 193 AT VARIOUS LOCATIONS.12/04/20141 (02/11/2013)Details CEM-3701 Report
7300Project ID: 7300
DEA: 060P4704
EFIS: 0612000267
06-KER-5-62.0/73.0Slab ReplacementNear Bakersfield , 10 miles north of 5/58 Junction to the 5/46 Junction10/16/20201 (03/28/2012)Details CEM-3701 Report
212320Project ID: 212320
DEA: 060S5504
EFIS: 0614000220
06-KER-99-32.40MINOR A PROGRAM: LERDO CANAL MEDIAN GAP CLOSURENEAR BAKERSFIELD AT LERDO CANAL10/14/20201 (09/25/2018)Details CEM-3701 Report
211080Project ID: 211080
DEA: 060V0304
06-KER-99-7.3Girder replacement and repairs due to bridge hitNear Bakersfield, from 7.3 miles N of the Rte 99/5 Jct to 6.1 miles S of the Rte 99/119 Jct at Ker 99-7.2904/04/20221 (01/29/2016)Details CEM-3701 Report
214343Project ID: 214343
DEA: 081K5204
EFIS: 0819000058
08-RIV-243,243-0/28,47/70, 0.0/28 & 47/70Roadway Washout- Repair storm damage including roadway washout and and damaged pavemetn, embankment, guardrail,m and culvertsNear Banning and on Route 74 near Hermet06/30/20211 (06/24/2021)Details CEM-3701 Report
211046Project ID: 211046
DEA: 080R7104
08-SBD-15-R87.3/R91.8INSTALL SINGLE & DOUBLE THRIE BEAM BARRIER IN MEDIANNEAR BARSTOW FROM AGRICULTURAL INSPECTION STATION TO COYOTE LAKE ROAD OC07/13/2016NOT VERIFIEDDetails CEM-3701 Report
211146Project ID: 211146
DEA: 022H4404
02-PLU-70-11.27, 11.27Remove slide, slope stabilizationNear Belden01/08/20191 (03/15/2016)Details CEM-3701 Report
7809Project ID: 7809
DEA: 024F8404
EFIS: 0213000042
02-PLU-70-12.8/16.54Remove Debris, install debris racks, improve sumps to prevent culvert clogsNear Belden at 0.8 mile west of Chip Creek Bridge to North Fork River Bridge01/18/20131 (10/22/2012)Details CEM-3701 Report