Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13671-13680 of 18855 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3401 | Project ID: 3401 DEA: 06342434 | 06-FRE-180-101.8/106.7 | CONSTRUCT FREEWAY AND BRIDGES | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report | |
| 3406 | Project ID: 3406 DEA: 06350704 | 06-FRE-99-R .7 | WIDEN AND REHABILITATE FREEWAY AND WIDEN CONCRETE BRIDGES | 04/21/2011 | 1 (09/19/2006) | Details CEM-3701 Report | |
| 3409 | Project ID: 3409 DEA: 063568U4 EFIS: 0600000390 COOP: 061488 | 06-KIN,TUL-198-R21.5/R28.3,0.0/R3.4 | CONVERT 2 LANE CONVENTIONAL HIGHWAY TO 4 LANE DIVIDED EXPRESSWAY | 03/05/2013 | 1 (05/31/2012) | Details CEM-3701 Report | |
| 3411 | Project ID: 3411 DEA: 06388214 | 06-TUL-99-48.4/49.9 | Perform Highway Planting and Install Irrigation System | 04/21/2011 | 1 (05/18/2007) | Details CEM-3701 Report | |
| 3413 | Project ID: 3413 DEA: 06393504 MINOR: 06A0997 | 06-MAD-- | 07/28/2020 | 1 (01/02/2015) | Details CEM-3701 Report | ||
| 3414 | Project ID: 3414 DEA: 063937U4 | 06-TUL-137-24.1,25.7 | EXISTING HIGHWAY TO BE MODIFIED & INSTALLED SIGNALS & CURB RAMPS | 04/21/2011 | 1 (06/29/2006) | Details CEM-3701 Report | |
| 3415 | Project ID: 3415 DEA: 06395204 Permit Numbers: 0607NSN0359 | 06-KER-178-R9.4/R12.1 | SR 178 and Fairfax Road Interchange Project | 05/24/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 3418 | Project ID: 3418 DEA: 06406004 EFIS: 0600000403 MINOR: 06A1130 | 06-KER-43-37.7 | INSTALL LIGHTING AND CONSTRUCT WINGWALLS | 03/24/2020 | 2 (12/05/2014) | Details CEM-3701 Report | |
| 3420 | Project ID: 3420 DEA: 06407214 COOP: 1379A1 | 06-MAD-99,145-16.4/16.8, 14.3/14.8 | Existing Roadway To Be Overlaid With Hma; Bridge To Be Widened. | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report | |
| 3421 | Project ID: 3421 DEA: 06408404 COOP: 061480 | 06-KER-14-16.2 | CONVERT 2-LANE CONVENTIONAL HIGHWAY INTO A 4-LANE DIVIDED EXPRESSWAY | 04/21/2011 | 1 (02/21/2006) | Details CEM-3701 Report |
