Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13661-13670 of 18756 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2158 | Project ID: 2158 DEA: 042E1104 | 04-NAP-29-5.1/7.0 | COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | NAPA COUNTY NEAR NAPA FROM 0.3 MILE NORTH OF ROUTE 12 EAST / AIRPORT BOULEVARD JUNCTION TO NAPA RIVER BRIDGE | 09/20/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
| 7120 | Project ID: 7120 DEA: 042E5804 EFIS: 0400021224 | 04-NAP-128-19.1/34.3 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT. | NAPA COUNTY NEAR NAPA FROM KNOXVILLE ROAD TO SOLANO COUNTY LINE | 03/26/2013 | 1 (05/30/2012) | Details CEM-3701 Report |
| 209259 | Project ID: 209259 DEA: 043E4004 EFIS: 0412000303 | 04-NAP-128-19.1/34.3 | RUBBERIZED BONDED WEARING COURSE -GAP GRADED OVERLAY. | NAPA COUNTY NEAR NAPA FROM KNOXVILLE ROAD TO SOLANO COUNTY LINE... | 06/29/2015 | 1 (04/25/2016) | Details CEM-3701 Report |
| 6841 | Project ID: 6841 DEA: 04264134 EFIS: 0400002022 | 04-NAP-12-0.0/3.2 | WIDENING HIGHWAY TO 4 LANES AND CONSTRUCTING RETAINING WALLS | NAPA COUNTY NEAR NAPA FROM ROUTE 29 TO 0.1 MILE WEST OF SOLANO COUNTY LINE | 08/08/2018 | 1 (04/09/2012) | Details CEM-3701 Report |
| 1959 | Project ID: 1959 DEA: 041E9904 | 04-NAP-221-0.0/2.7 | OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | NAPA COUNTY NEAR NAPA FROM ROUTE 29 TO IMOLA AVENUE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 993424 | Project ID: 993424 DEA: 04281204 EFIS: 0400000769 | 04-NAP-29,221-5.5/6.7,0.0/0.2 | HMA, RDWY EXCAVATION, STRUCTURAL CONC AND MODIFYING LIGHTING SYSTEMS. | NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILE SOUTH TO 0.5 MILE NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILE NORTH OF ROUTE 29 TO ROUTE 29 | 1 (12/08/2021) | Details CEM-3701 Report | |
| 213702 | Project ID: 213702 DEA: 041G4304 EFIS: 0412000126 | 04-NAP-128-R7.4 | REPLACE BRIDGE, HMA PAVING, DRAINAGE AND RSP | NAPA COUNTY NEAR SAINT HELENA AT CONN CREEK | 12/08/2022 | 1 (07/29/2019) | Details CEM-3701 Report |
| 994290 | Project ID: 994290 DEA: 044G84A4 EFIS: 0419000004 | 04-NAP-128-20.2 | MAINTAIN EXISTING PLANTED AREA. | NAPA COUNTY NEAR ST. HELENA AT CAPELL CREEK BRIDGE | 1 (10/14/2022) | Details CEM-3701 Report | |
| 994378 | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 | 04-NAP-29-16.4/19.0 | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG | 1 (10/27/2022) | Details CEM-3701 Report | |
| 211689 | Project ID: 211689 DEA: 042594A4 EFIS: 0412000642 | 04-NAP-29-R20.4/R20.8 | HIGHWAY PLANTING | NAPA COUNTY NEAR YOUNTVILLE FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF WASHINGTON STREET | 10/14/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
