Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13651-13660 of 18758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1000262Project ID: 1000262
DEA: 040Q8304
EFIS: 0418000160
04-NAP-29-46.1SOLDIER PILE, CONC BACKFILL, HMA, TIMBER LAGGING, AND MGS.NAPA COUNTY NEAR CALISTOGA AT 2.5 MILES SOUTH OF LAKE COUNTY LINE 1 (06/03/2024)Details CEM-3701 Report
2390Project ID: 2390
DEA: 044C1404
EFIS: 0400020062
04-NAP-29-38.1/48.6COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED).NAPA COUNTY NEAR CALISTOGA FROM 0.2 MILE NORTH OF SILVERADO TRAIL TO LAKE COUNTY LINE01/17/20141 (02/18/2011)Details CEM-3701 Report
7652Project ID: 7652
DEA: 044S0204
EFIS: 0400001199
04-NAP-29-40.9/41.4PLACE HMA, CONSTRUCT TIE-BACK WALL AND SOIL NAIL WALL.NAPA COUNTY NEAR CALISTOGA FROM 1.4 MILES TO 1.9 MILES NORTH OF TUBBS LANE.01/09/20141 (10/15/2012)Details CEM-3701 Report
1000097Project ID: 1000097
DEA: 042Y5104
EFIS: 0423000123
04-NAP-128-4.6/7.4COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT.NAPA COUNTY NEAR CALISTOGA FROM ROUTE 29 TO SILVERADO TRAIL08/13/20241 (06/03/2024)Details CEM-3701 Report
209866Project ID: 209866
DEA: 043G7604
EFIS: 0412000170
04-NAP-128-20.2INSTALL HORIZONTAL DRAINS, SLOPE INDICATORS, AND HIGHWAY PLANTING.NAPA COUNTY NEAR CAPELL CREEK BRIDGE12/14/20171 (04/25/2016)Details CEM-3701 Report
7684Project ID: 7684
DEA: 044S0304
EFIS: 0400001200
04-NAP-128-10.2/10.4REPLACE ROADWAY SECTION WITH LIGHTWEIGHT CONCRETE AND UPGRADE DRAINAGENAPA COUNTY NEAR LAKE HENNESSEY FROM 2.8 MILES TO 3.0 MILES EASE OF SILVERADO TRAIL...06/29/20151 (10/22/2012)Details CEM-3701 Report
213592Project ID: 213592
DEA: 042J5704
04-NAP-121-20.6REPAIR EMBANKMENT UPGRADE DRAINAGE FACILITIES.NAPA COUNTY NEAR NAPA AT 1.5 MILES SOUTH OF ROUTE 121 JUNCTION08/15/20221 (08/19/2019)Details CEM-3701 Report
214970Project ID: 214970
DEA: 044J2104
EFIS: 0415000288
04-NAP-121-18.6STRUCTURE EXCAVATION, INSTALL TEMPORARY SIGNAL SYSTEM AND CONCRETE.NAPA COUNTY NEAR NAPA AT CAPELL CREEK BRIDGE01/10/20241 (10/19/2020)Details CEM-3701 Report
1001485Project ID: 1001485
DEA: 040Q7904
EFIS: 0418000153
04-NAP-121-13.4/20.7INSTALL SHEET PILE WALLS, ROCK SLOPE PROTECTION, AND EROSION CONTROL.NAPA COUNTY NEAR NAPA AT VARIOUS LOCATIONS FROM 0.7 MILE WEST OF WILD HORSE VALLEY ROAD TO 1 MILE SOUTH OF ROUTE 128 1 (08/14/2025)Details CEM-3701 Report
214991Project ID: 214991
DEA: 044G2104
EFIS: 0412000310
04-NAP-121-0.5/1WIDEN ROADWAY WITH HMA & REPLACE CULVERT WITH STRUCTURAL CONC BRIDGE.NAPA COUNTY NEAR NAPA FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF HUICHICA CREEK BRIDGE10/09/20241 (10/19/2020)Details CEM-3701 Report