Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13641-13650 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5204 | Project ID: 5204 DEA: 081A2814 EFIS: 0800000566 COOP: 060064 | 08-SBD-210-6.4/10.3 | CONSTRUCT SOUNDWALLS SEGMENT 3 & 4 | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
| 5203 | Project ID: 5203 DEA: 081A2804 EFIS: 0800000565 | 08-SBD-210-6.3/10.3 | CUCAMONGA CREEK CHANNEL TO CENTERLINE OF HERMOSA AVE. OVERCROSSING | 10/31/2012 | 2 (10/31/2012) | Details CEM-3701 Report | |
| 5202 | Project ID: 5202 DEA: 081A2704 EFIS: 0800000563 | 08-SBD-210-0.0/3.27 | Highway 210 Segment 1 | 1 (02/24/2006) | Details CEM-3701 Report | ||
| 5201 | Project ID: 5201 DEA: 081A2504 | 08-SBd-40-.9 | Construct Concrete Channel And Install Metal Beam Guard Rail. | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5200 | Project ID: 5200 DEA: 081A1304 | 08-SBD-62-47.5/49.4 | ASPHALT CONCRETE OVERLAY | IN SAN BERNARDINO COUNTY IN TWENTYNINE PALMS ON ROUTE 62 FROM CEDAR AVENUE TO CHARLOTTE ROAD | 1 (07/21/2006) | Details CEM-3701 Report | |
| 5199 | Project ID: 5199 DEA: 081A0104 | 08-RIV-74-R23.5 | ASPHALT CONCRETE OVERLAY | IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM MAPES ROAD TO NAVAJO ROAD | 1 (04/16/2014) | Details CEM-3701 Report | |
| 5198 | Project ID: 5198 EFIS: 0000001155 Permit Numbers: 0811NRW0155 | 08-RIV-111-53.821/53.877 | Enter onto State right of way at Vista Chino (SR-111) and Indian Canyon Drive in City of Palm Springs to modify existing traffic signal and install a wireless signal interconnect system at Palm canyon Drive as per plans and special provisions date stamped | Vista Chino (SR-111) Indian Canyon Drive, Palm Springs | 03/04/2011 | 1 (03/04/2011) | Details CEM-3701 Report |
| 5197 | Project ID: 5197 DEA: 08468004 EFIS: 0800000744 COOP: 12224 Permit Numbers: 0812NDP0909 0811NMC0715 0812NDP0909 | 08-SBD-10-12.3/14.1 | Enter onto Interstate 10 (I-10) right-of-way at Cherry Avenue in the City of Fontana to reconstruct the Cherry Avenue interchange as per plans and specifications date stamped September 14, 2011, per parent permit 08-11-N-MC-0715, and per SWPPP and permit | Cherry Avenue, Fontana | 09/14/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
| 5196 | Project ID: 5196 DEA: 08464614 EFIS: 0800001041 Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148 | 08-RIV--12.2/15.8 | Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & lig | State Route 79 (Winchester Road), Murrieta area | 1 (05/17/2012) | Details CEM-3701 Report | |
| 5195 | Project ID: 5195 DEA: 080K4004 EFIS: 0800000345 Permit Numbers: 0811NMC0640 0811NMC0640 | 08-RIV-79-7.63/8.44 | Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sig | State Route 79 (Winchester Road), Murrieta | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
