Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13641-13650 of 18754 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5204Project ID: 5204
DEA: 081A2814
EFIS: 0800000566
COOP: 060064
08-SBD-210-6.4/10.3CONSTRUCT SOUNDWALLS SEGMENT 3 & 4 08/17/20212 (07/09/2021)Details CEM-3701 Report
5203Project ID: 5203
DEA: 081A2804
EFIS: 0800000565
08-SBD-210-6.3/10.3CUCAMONGA CREEK CHANNEL TO CENTERLINE OF HERMOSA AVE. OVERCROSSING 10/31/20122 (10/31/2012)Details CEM-3701 Report
5202Project ID: 5202
DEA: 081A2704
EFIS: 0800000563
08-SBD-210-0.0/3.27Highway 210 Segment 1  1 (02/24/2006)Details CEM-3701 Report
5201Project ID: 5201
DEA: 081A2504
08-SBd-40-.9Construct Concrete Channel And Install Metal Beam Guard Rail. 07/29/20101 (07/29/2010)Details CEM-3701 Report
5200Project ID: 5200
DEA: 081A1304
08-SBD-62-47.5/49.4ASPHALT CONCRETE OVERLAYIN SAN BERNARDINO COUNTY IN TWENTYNINE PALMS ON ROUTE 62 FROM CEDAR AVENUE TO CHARLOTTE ROAD 1 (07/21/2006)Details CEM-3701 Report
5199Project ID: 5199
DEA: 081A0104
08-RIV-74-R23.5ASPHALT CONCRETE OVERLAYIN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM MAPES ROAD TO NAVAJO ROAD 1 (04/16/2014)Details CEM-3701 Report
5198Project ID: 5198
EFIS: 0000001155
Permit Numbers: 0811NRW0155
08-RIV-111-53.821/53.877Enter onto State right of way at Vista Chino (SR-111) and Indian Canyon Drive in City of Palm Springs to modify existing traffic signal and install a wireless signal interconnect system at Palm canyon Drive as per plans and special provisions date stampedVista Chino (SR-111) Indian Canyon Drive, Palm Springs03/04/20111 (03/04/2011)Details CEM-3701 Report
5197Project ID: 5197
DEA: 08468004
EFIS: 0800000744
COOP: 12224
Permit Numbers: 0812NDP0909 0811NMC0715 0812NDP0909
08-SBD-10-12.3/14.1Enter onto Interstate 10 (I-10) right-of-way at Cherry Avenue in the City of Fontana to reconstruct the Cherry Avenue interchange as per plans and specifications date stamped September 14, 2011, per parent permit 08-11-N-MC-0715, and per SWPPP and permitCherry Avenue, Fontana09/14/20151 (12/12/2012)Details CEM-3701 Report
5196Project ID: 5196
DEA: 08464614
EFIS: 0800001041
Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148
08-RIV--12.2/15.8Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & ligState Route 79 (Winchester Road), Murrieta area 1 (05/17/2012)Details CEM-3701 Report
5195Project ID: 5195
DEA: 080K4004
EFIS: 0800000345
Permit Numbers: 0811NMC0640 0811NMC0640
08-RIV-79-7.63/8.44Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sigState Route 79 (Winchester Road), Murrieta07/31/2018NOT VERIFIEDDetails CEM-3701 Report