Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13631-13640 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209343 | Project ID: 209343 DEA: 043E2204 EFIS: 0412000285 | 04-NAP-29-13.5/19.8 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HMA (TYPE A). | NAPA COUNTY IN AND NEAR NAPA AND IN YOUNTVILLE FROM 0.5 MILE NORTH OF TRANCAS STREET OVERCROSSING TO MADISON STREET | 08/01/2018 | 1 (02/25/2014) | Details CEM-3701 Report |
| 1000251 | Project ID: 1000251 DEA: 042Y5004 EFIS: 0423000122 | 04-NAP-221-0.2/1.7 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | NAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF JUNCTION ROUTE 12/29 TO 0.2 MILE NORTH OF BASALT ROAD UNDERCROSSING | 01/09/2025 | 1 (06/03/2024) | Details CEM-3701 Report |
| 1000538 | Project ID: 1000538 DEA: 042Q6104 EFIS: 0419000030 | 04-NAP-29-R7.3/13.5 | COLD PLANE, RHMA OVERLAY, INSTALL MGS, CURB RAMP, AND RUMBLE STRIP. | NAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF NAPA RIVER BRIDGE OVERHEAD TO 0.1 MILE SOUTH OF SIERRA AVENUE. | 1 (08/29/2024) | Details CEM-3701 Report | |
| 213728 | Project ID: 213728 DEA: 041K0104 EFIS: 0416000179 | 04-NAP-121-0.0-0.3,2.0-R4.5 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | NAPA COUNTY IN AND NEAR NAPA FROM SONOMA COUNTY LINE TO 0.3 MILE NORTH OF SONOMA COUNTY LINE AND FROM DUHIG ROAD TO ROUTE 29 | 04/22/2020 | 1 (02/28/2019) | Details CEM-3701 Report |
| 7153 | Project ID: 7153 DEA: 042E4304 | 04-NAP-29-24.6/35.6 | COLD PLANE ASPHALT CONCRETE AND OVERLAY WITH HOT MIX ASPHALT. | NAPA COUNTY IN AND NEAR SAINT HELENA AND CALISTOGA FROM JUNCTION ROUTE 128 EAST RUTHERFORD TO 0.2 MILE SOUTH OF DIAMOND MOUNTAIN ROAD | 11/08/2012 | 1 (11/15/2012) | Details CEM-3701 Report |
| 993300 | Project ID: 993300 DEA: 044J3004 EFIS: 0415000320 | 04-NAP-29-29.3/36.9 | COLD PLANE AC, PLACE HMA (TYPE A) AND RHMA-G. | NAPA COUNTY IN AND NEAR SAINT HELENA AND CALISTOGA FROM YORK CREEK BRIDGE TO ROUTE 128 | 05/31/2023 | 1 (10/22/2021) | Details CEM-3701 Report |
| 210066 | Project ID: 210066 DEA: 04259404 EFIS: 0400000723 | 04-NAP-29-25.5/28.4 | OVERLAY, ROADWAY WIDENING AND CONSTRUCT TWO-WAY LEFT-TURN LANES. | NAPA COUNTY IN AND NEAR ST. HELENA FROM MEE LANE TO 0.1 MILE SOUTH OF SULPHUR CREEK BRIDGE | 12/14/2017 | 1 (08/21/2015) | Details CEM-3701 Report |
| 211931 | Project ID: 211931 DEA: 043G6414 EFIS: 0416000348 | 04-NAP-29-37.0 | SCOUR REPLACE BRIDGE | NAPA COUNTY IN CALISTOGA AT NAPA RIVER BRIDGE | 04/22/2020 | 1 (02/15/2017) | Details CEM-3701 Report |
| 6974 | Project ID: 6974 DEA: 044C3514 | 04-NAP-128-4.0/4.6 | COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HMA (GAP GRADED). | NAPA COUNTY IN CALISTOGA FROM HIGH STREET TO KORTUM CANYON ROAD | 08/16/2013 | 1 (02/06/2012) | Details CEM-3701 Report |
| 7039 | Project ID: 7039 DEA: 040G5304 | 04-NAP-29-36.9/38.1 | COLD PLANE AND RESURFACE ASPHALT CONCRETE PAVEMENT. | NAPA COUNTY IN CALISTOGA FROM JUNCTION ROUTE 128 TO 0.2 MILE NORTH OF SILVERADO TRAIL | 09/28/2012 | 1 (02/27/2012) | Details CEM-3701 Report |
