Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13471-13480 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213559 | Project ID: 213559 DEA: 051E0514 EFIS: 0515000079 MINOR: 05A2069 | 05-MON-101-53.2 | Landscape for Safety facility upgrades near Greenfield. Roadside cleaning, irrigation, planting, and plant establishment,- Greenfield CURE Replacement Planting | Monterey County | 1 (09/30/2019) | Details CEM-3701 Report | |
| 7040 | Project ID: 7040 DEA: 050R8104 EFIS: 0500000380 | 05-MON-1-0.3 | INSTALL PIPE CULVERT AND ROCK SLOPE PROTECTION. | MONTEREY COUNTY ABOUT 10.0 MILES SOUTH OF GORDA AT PEPPERWOOD GULCH | 07/23/2013 | 1 (03/20/2012) | Details CEM-3701 Report |
| 215709 | Project ID: 215709 DEA: 051H4604 EFIS: 0516000077 | 05-MON-1-63.0 | REHAB BRIDGE STRUCTURE AND ELECTROCHEMICAL CHLORIDE EXTRACTION. | MONTEREY COUNTY ABOUT 11.3 MILES SOUTH OF CARMEL AT GARRAPATA CREEK BRIDGE | 12/14/2023 | 1 (05/12/2021) | Details CEM-3701 Report |
| 213578 | Project ID: 213578 DEA: 051A0004 EFIS: 0500020284 | 05-MON-1-58.3/59.8 | WIDEN SHOULDERS OF EXISTING ROADBED AND UPGRADE GUARDRAIL | MONTEREY COUNTY ABOUT 13 MILES NORTH OF BIG SUR FROM 1 MILE SOUTH OF BIXBY CREEK BRIDGE TO 0.3 MILE SOUTH OF ROCKY CREEK BRIDGE | 10/29/2020 | 1 (09/06/2019) | Details CEM-3701 Report |
| 209410 | Project ID: 209410 DEA: 051A8904 EFIS: 0512000036 | 05-MON-1-67.9 | REPAIR SPALLED CONCRETE, EXTRACT CHLORIDE, INSTALL CATHODIC PROTECTION | MONTEREY COUNTY ABOUT 14 MILES SOUTH OF CARMEL AT MALPASO CREEK BRIDGE | 06/01/2016 | 1 (07/01/2014) | Details CEM-3701 Report |
| 7377 | Project ID: 7377 DEA: 051A6904 EFIS: 0512000008 | 05-MON-1-58.3,59.9 | CONSTRUCT VIADUCT | MONTEREY COUNTY ABOUT 15 MILES SOUTH OF CARMEL AT 0.1 MILE SOUTH OF ROCKY CREEK BRIDGE AND AT 1.1 MILE SOUTH OF BIXBY CREEK BRIDGE | 05/19/2014 | 1 (10/01/2012) | Details CEM-3701 Report |
| 212308 | Project ID: 212308 DEA: 051C6604 EFIS: 0512000186 | 05-MON-198-22.4/22.8 | WIDEN SHOULDER, RECONSTRUCT ROADWAY AND RESURFACE PAVEMENT WITH HMA. | MONTEREY COUNTY ABOUT 22 MILES EAST OF SAN LUCAS FROM 0.1 MILE WEST TO 0.3 MILE EAST OF NORTH FORK ROAD | 08/14/2018 | 1 (04/26/2017) | Details CEM-3701 Report |
| 2796 | Project ID: 2796 DEA: 050Q2004 | 05-MON-101-R12.6/R15.5 | Construct inside shoulder and rumble strip | MONTEREY COUNTY ABOUT 6 MILES NORTH OF BRADLEY FROM 2.9 MILES NORTH OF JOLON ROAD UNDERCROSSING TO ALVARADO ROAD OVERCROSSING | 06/14/2011 | 1 (03/01/2010) | Details CEM-3701 Report |
| 7041 | Project ID: 7041 DEA: 05493704 EFIS: 0500000577 | 05-MON-1-0.9 | REPLACE CULVERT. | MONTEREY COUNTY ABOUT 9.0 MILES SOUTH OF GORDA AT SILVER SPUR CREEK | 07/23/2013 | 1 (03/20/2012) | Details CEM-3701 Report |
| 994246 | Project ID: 994246 DEA: 051H6904 EFIS: 0516000140 | 05-MON-101-R91.3/98.8,100.3/101.3 | PLACE RHMA, INSTALL CONCRETE BARRIER AND DRAINAGE SYSTEMS. | MONTEREY COUNTY AT AND NEAR PRUNEDALE AND SALINAS FROM 0.3 MILE NORTH OF BORONDA ROAD OVERCROSSING TO 0.4 MILE NORTH OF CRAZY HORSE CANYON ROAD OVERCROSSING AND FROM 0.9 MILE NORTH OF CRAZY HORSE CANYON ROAD OVERCROSSING TO SAN JUAN ROAD OVERCROSSING | 1 (09/19/2022) | Details CEM-3701 Report |
