Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13411-13420 of 17322 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6453 | Project ID: 6453 Permit Numbers: 12086RT0484 | 12-ORA-1-24.7/24.85 | Relocate traffic signals and install street lighting (Original Permit #1203-6RC-0459) | PCH in the City of Huntington Beach | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
4160 | Project ID: 4160 DEA: 072X7904 | 07-LA-1-35.2 | REMOVE ALL STORM DEBRIS AND FIX DRAINAGE | PCH, FROM PM 35.2 IN THE CITY OF MALIBU NORTH THROUGH THE CITY OF MALIBU TO PM62.9 AT THE LA/VENTURA COUNTY LINE. DIR'S ORDER EMERGENCY FA CONTRACT | 05/02/2012 | 1 (04/06/2010) | Details CEM-3701 Report |
208823 | Project ID: 208823 Permit Numbers: 0712NMC1669 | 07-LA-1-55.555/55.555 | Signal and median opening for temporary fire station | PCH, Malibu | 07/31/2018 | 1 (04/24/2013) | Details CEM-3701 Report |
211548 | Project ID: 211548 Permit Numbers: 07166MC0383 | 07--1-56.7/56.9 | Modify the intersection include traffic signals, curb-ramp, sidewalk and driveway | PCH, Malibu | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
211922 | Project ID: 211922 Permit Numbers: 07166MC0756 | 07--1-47/47.4 | Intersection improvement includes: Add an additional left-turn lane, modify traffic signals & striping , new sidewalk, curb & gutter, remove raised median, upgrade curb ramps | PCH, Malibu | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
213400 | Project ID: 213400 Permit Numbers: 0715NMC1846 07186DP0480 0717NRT0925 07186RT1695 | 07--1-13.3/13.3 | Upgrade traffic signals & lighting,remove & reconstruct concrete curb and gutter,sidewalk,cross gutter,driveways, and ADA curb ramps,pull boxes,new signs and relocate raised medianDouble Permit No. 718-6DP-0480 | PCH, Western Ave, Lomita | 06/17/2021 | 1 (08/15/2018) | Details CEM-3701 Report |
212943 | Project ID: 212943 Permit Numbers: 07166MC2504 07176RW2072 | 07-LA-1-46.93/47.55 | constructing mitigation improvements along Pacific Coast Highway (Route 1, PCH) between Cross Creek Road and Webb Way in the city of Malibu; modifying medians sections, a curb return, pavement sections, traffic signals and systems, pavement striping and delineations, constructing curb ramps, and pr | PCH/State Route 1, Malibu | 06/17/2021 | 1 (12/06/2017) | Details CEM-3701 Report |
6443 | Project ID: 6443 DEA: 120G5004 Permit Numbers: 1207NMC0274 1208NRD0163 | 12-ORA-405-11.45 | Construct a tie-back wall and widen southbound Harbor Blvd. at I-405 | Perform improvements along Harbor Blvd. | 07/28/2010 | NOT VERIFIED | Details CEM-3701 Report |
210795 | Project ID: 210795 DEA: 01497714 EFIS: 0100020262 | 01-MEN-1-2.4 | PERMANENT RESTORATION SLIPOUT/REPAIR DRAINAGE | PERMANENT RESTORATION SLIPOUT/REPAIR DRAINAGE | 02/16/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
995503 | Project ID: 995503 Permit Numbers: 0223NSN0345 | 02-SHA-273-16.91 | Reconstruct CG&S, striping and signal & lighting modifications. To include Ameron arm and pole. | Permit project - Trinity Street Bikeway | 1 (01/03/2024) | Details CEM-3701 Report |