Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13381-13390 of 19060 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214558 | Project ID: 214558 Permit Numbers: 0319NUL0807 03196DP1264 | 03--- | 04/07/2021 | 1 (10/05/2020) | Details CEM-3701 Report | ||
| 214559 | Project ID: 214559 DEA: 05111914 | 05-SBT-80- | Salesforce Transit Center | NOT VERIFIED | Details CEM-3701 Report | ||
| 214954 | Project ID: 214954 Permit Numbers: 0419NUT1922 | 04-SM-82-8.57 | A new 12" HDPE sanitary sewer force force main will be installed within a new 20' HDPE casing pipe on the North Bound lanes of El Camino Real between North Road and middle Road. | El Camino Real, Belmont | 05/01/2023 | 1 (10/26/2020) | Details CEM-3701 Report |
| 214577 | Project ID: 214577 DEA: 11430044 EFIS: 1117000131 COOP: 118440 | 11-SD-67-2.64 | he State Route 67 (SR-67) and Woodside Avenue Improvements Project (Project) is located within Santee, California in San Diego County. The City of Santee (City) in cooperation with the California Department of Transportation (Caltrans) will modify the existing intersection at the southbound SR-67 of | The project encompasses limits from Station "FR-5A" 166+56 (PM 2.64) to Station "NW-WOOD A" 179+51 (PM 2.78) along Woodside Avenue to State Route 67, and from Station "FR-5A" 171+86 to Station "WD-1A" 175+45 along N Woodside Avenue to Woodside Avenue. | 2 (12/09/2019) | Details CEM-3701 Report | |
| 214568 | Project ID: 214568 DEA: 07353404 EFIS: 0718000289 Permit Numbers: 0719ADP1912 | 07-LA-72-5.243/5.3 | Addition of East bound and west bound through lane , east bound right turn lane and second west bound left turn lane at Philadelphia st, bike lane, new bus stop, modification to signal phasing and temporary traffic controls | City of Whittier , Whitter Blvd, State Hwy 72, 0.1 mile North West of Sorensen Ave to 0.2 mile south east of Philadelphia St. | 2 (08/19/2025) | Details CEM-3701 Report | |
| 214560 | Project ID: 214560 DEA: 073P7504 EFIS: 0712000278 MINOR: 07A4781 | 07-VEN-1- | INSTALL PROTECTED LEFT TURN PHASING FOR WB RINALDI ST. | Ventura County | 1 (03/10/2020) | Details CEM-3701 Report | |
| 214561 | Project ID: 214561 DEA: 074P4904 EFIS: 0718000012 | 07-LA-118-R4.4/R7.6 | Irrigation Rehab | 1 (06/30/2021) | Details CEM-3701 Report | ||
| 214562 | Project ID: 214562 DEA: 040J7104 EFIS: 0414000029 | 04-SOL-80-1.8/4.4 | RAISE BRIDGE AND PLACE STRUCTURAL CONCRETE. | SOLANO COUNTY IN VALLEJO AT VARIOUS LOCATIONS | 02/29/2024 | 1 (12/03/2019) | Details CEM-3701 Report |
| 214563 | Project ID: 214563 DEA: 060U6704 EFIS: 0616000120 | 06-MAD-145-9.7/11.0 | CONSTRUCT ADA CURB RAMPS. | MADERA COUNTY IN MADERA AT VARIOUS LOCATIONS FROM GATEWAY DRIVE TO TOZER STREET | 07/15/2021 | 1 (01/31/2020) | Details CEM-3701 Report |
| 214564 | Project ID: 214564 DEA: 060X5904 EFIS: 0618000097 | 06-FRE-99-21.7 | HMA SURFACING, CONSTRUCT CONCRETE BARRIER & MODIFY ELECTRICAL SYSTEM. | FRESNO COUNTY IN FRESNO AT NORTHBOUND CONNECTOR TO EASTBOUND ROUTE 180 | 04/21/2021 | 1 (01/31/2020) | Details CEM-3701 Report |
