Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13291-13300 of 18859 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211093 | Project ID: 211093 DEA: 101E2704 EFIS: 1015000066 | 10-MER-99-13.1/R36.7 | TREAT BRIDGE DECK, REPLACE APPROACH SLABS AND JOINT SEALS. | MERCED COUNTY AT VARIOUS LOCATIONS FROM CHILD S AVENUE OVERCROSSING TO GRIFFITH ROAD OVERCROSSING. In District 10 On Route 99 | 04/14/2021 | 1 (08/22/2016) | Details CEM-3701 Report |
| 208901 | Project ID: 208901 DEA: 100S9504 EFIS: 1000020386 | 10-MER-99-13.1/R36.7 | PAINT BRIDGE AND SLOPE PAVING | MERCED COUNTY AT VARIOUS LOCATIONS FROM CHILDS AVENUE OVERCROSSING TO GRIFFITH ROAD OVERCROSSING | 07/28/2021 | 1 (01/06/2014) | Details CEM-3701 Report |
| 1000031 | Project ID: 1000031 DEA: 101P7504 EFIS: 1022000161 | 10-MER-99-R6.8/R34.1 | COLD PLANE AC PAVEMENT AND PLACE POLYESTER CONCRETE DECK OVERLAY. | MERCED COUNTY AT VARIOUS LOCATIONS FROM LE GRAND OVERCROSSING TO EL CAPITAN WAY UNDERCROSSING | 1 (01/17/2024) | Details CEM-3701 Report | |
| 215085 | Project ID: 215085 DEA: 100Y1104 EFIS: 1013000108 | 10-MER-140-0.0/42.1 | REMOVE AND REPLACE GUARDRAIL, TERMINAL SYSTEM AND END TREATMENTS. | MERCED COUNTY AT VARIOUS LOCATIONS FROM ROUTE 140/5 SEPARATION TO 1.3 MILES EAST OF N ARBOLEDA DRIVE. | 05/03/2022 | 1 (08/03/2020) | Details CEM-3701 Report |
| 214778 | Project ID: 214778 DEA: 101J7204 EFIS: 1018000207 | 10-MER-140-4.2/6.1,35.8/44.0 | REPLACE PAVEMENT DELINEATION. | MERCED COUNTY AT VARIOUS LOCATIONS FROM WEST JUNCTION 33 TO EAST JUNCTION 33 AND FROM ROUTE 99/140 SEPARATION TO 0.1 MILE EAST OF WATT STREET | 10/23/2020 | 1 (03/16/2020) | Details CEM-3701 Report |
| 213032 | Project ID: 213032 DEA: 101G3304 EFIS: 1016000157 | 10-MER-5,152-Var | REPLACE JOINT SEALS, APPROACH SLABS, POLYESTER CONCRETE OVERLAY. | MERCED COUNTY AT VARIOUS LOCATIONS. | 12/18/2018 | 1 (04/24/2018) | Details CEM-3701 Report |
| 214395 | Project ID: 214395 DEA: 103A7204 EFIS: 1013000259 | 10-MER-99-20.1/24.3 | PLACE CRCP AND HMA. | MERCED COUNTY IN AND NEAR ATWATER FROM 0.4 MILE SOUTH OF BUHACH OVERCROSSING TO 0.8 MILE NORTH OF WEST ATWATER OVERHEAD | 08/23/2023 | 1 (09/13/2019) | Details CEM-3701 Report |
| 5905 | Project ID: 5905 DEA: 10414824 EFIS: 1000000429 | 10-MER-99-24.4/R25.8 | HIGHWAY PLANTING AND IRRIGATION | MERCED COUNTY IN AND NEAR ATWATER FROM 0.7 MILE NORTH OF ATWATER OVERHEAD TO 0.7 MILE SOUTH OF ARENA WAY | 11/04/2016 | 1 (10/17/2011) | Details CEM-3701 Report |
| 215341 | Project ID: 215341 DEA: 101J1204 EFIS: 1018000150 | 10-MER-33-R0.0/L5.7 | COLD PLANE ASPHALT CONCRETE AND PLACE HOT MIX ASPHALT. | MERCED COUNTY IN AND NEAR DOS PALOS FROM FRESNO COUNTY LINE TO 0.1 MILE NORTH OF EAST JUNCTION ROUTE 152 | 03/02/2022 | 1 (11/30/2020) | Details CEM-3701 Report |
| 995126 | Project ID: 995126 DEA: 101G2504 EFIS: 1018000276 | 10-MER-33,140-R0.6/1.5,5.0/6.1 | CONSTRUCT CURB RAMP, SIDEWALK, AND DRIVEWAY. | MERCED COUNTY IN AND NEAR DOS PALOS ON ROUTE 33 FROM 0.3 MILE SOUTH OF VALERIA STREET TO 0.1 MILE NORTH OF SANTOS STREET AND IN GUSTINE ON ROUTE 140 FROM LINDEN AVENUE TO FIRST AVENUE | 12/29/2025 | 1 (09/26/2023) | Details CEM-3701 Report |
