Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13281-13290 of 18983 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7633 | Project ID: 7633 DEA: 120C5104 EFIS: 1200000076 Permit Numbers: 1211NDP0360 1210NMC0465 | 12-ORA-5-35.9/36 | construct the extension of Gene Autry Way (West Phase 2 portion) from the existing abutment of the right bridge at the I-5 HOV Interchange to approximately 750 feet westerly right of way of Manchester Avenue in Anaheim. Work will consist of the constructi | gene autry way, Anaheim | 07/01/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 211035 | Project ID: 211035 Permit Numbers: 0915NSN0117 0915NDP0265 | 09-KER--94.164/94.277 | Construct the East Tehachapi Traffic Signal and Street Improvements Project as shown on the attached plans. | Tehachapi Blvd, Tehachapi | 10/28/2019 | 1 (11/19/2015) | Details CEM-3701 Report |
| 208934 | Project ID: 208934 Permit Numbers: 10126RC0449 10126DP0760 10136RW0186 | 10-MER-165-10.149/10.149 | Construct the commercial driveway with landscape, sidewalk, ADA ramp, match existing curb, gutter, and restriping for left turn lane, as shown on the approved plans, in accordance to the State Standards and Specifications along State Highway 165 right of | SR 165, Los Banos | 01/16/2014 | 1 (06/18/2013) | Details CEM-3701 Report |
| 3107 | Project ID: 3107 DEA: 060E3104 | 06-FRE-41-R21.0/R29.3 | CONSTRUCT TEXTURED CONCRETE PAVING AND MAINTENANCE VEHICLE PULLOUTS. | FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF JENSEN AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF BULLARD AVENUE OVERCROSSING. | 06/07/2012 | 1 (06/06/2011) | Details CEM-3701 Report |
| 215557 | Project ID: 215557 DEA: 09367704 EFIS: 0917000001 | 09-INY,KER,MNO-14,89,120,168,178,etc.-Var | CONSTRUCT TERMINAL SYSTEMS, GUARDRAIL AND CONCRETE BARRIER. | INYO, KERN, AND MONO COUNTIES AT VARIOUS LOCATIONS | 01/18/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
| 209004 | Project ID: 209004 DEA: 074X1004 EFIS: 0714000023 | 07-LA-5,2-22.5,15.1 | Construct temporary support ,clear fire debris, repair related damages to tunnel Br No 53-0577 | LA-2/LA-5 interchange | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 994775 | Project ID: 994775 DEA: 042Y7404 EFIS: 0423000152 | 04-SCL-152-12.57/12.57 | Construct temporary creek diversion, remove silt/sediment from the creek, install RSP, install 5 new manholes, and clean existing drainage culverts. | 03/16/2026 | 1 (10/10/2024) | Details CEM-3701 Report | |
| 994398 | Project ID: 994398 DEA: 07388704 | 07-LA-101-19.7 | CONSTRUCT TEMPORARY CHAIN LINK RAILING AND MINOR CONCRETE. | LOS ANGELES COUNTY IN LOS ANGELES AT LOUISE AVENUE OVERCROSSING | 1 (07/24/2023) | Details CEM-3701 Report | |
| 7653 | Project ID: 7653 DEA: 044S1204 EFIS: 0400001209 | 04-SM-35-25.2 | CONSTRUCT TANGENT WALL AND EMBANKMENT REPAIR | SAN MATEO COUNTY IN SAN BRUNO AT 0.4 MILE NORTH OF SNEATH LANE | 08/22/2018 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7654 | Project ID: 7654 DEA: 044S3704 EFIS: 0400001230 | 04-ALA-580-11.1 | CONSTRUCT TANGENT PILE WALL | ALAMEDA COUNTY IN LIVERMORE ABOUT 0.4 MILE WEST OF ROUTE 580 AND FIRST STREET OVERCROSSING | 01/17/2014 | 1 (10/08/2012) | Details CEM-3701 Report |
