Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13281-13290 of 18756 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2719 | Project ID: 2719 DEA: 050N7104 EFIS: 0500000226 MINOR: 05A1043 | 05-SB-154-R5.9 | CONSTRUCT FLASHING BEACONS AND HIGHWAY LIGHTING | 03/23/2020 | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2720 | Project ID: 2720 DEA: 050N7204 EFIS: 0500000227 MINOR: 05A1245 | 05--- | 03/18/2020 | 1 (11/08/2019) | Details CEM-3701 Report | ||
| 2722 | Project ID: 2722 DEA: 050N7404 | 05-MON,SCR-1,8,VAR-VAR | JOINT SEAL REPAIR | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2723 | Project ID: 2723 DEA: 050N7504 MINOR: 05A1036 | 05-SLO-41-15.6 | CURED IN PLACE PIPE LINER | 03/18/2020 | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2726 | Project ID: 2726 DEA: 050N8304 | 05-MON-101-80.7/85.6 | CONSTRUCT CONCRETE MEDIAN BARRIER | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2728 | Project ID: 2728 DEA: 050N8404 | 05-SB-101- 50.8/ 54.0 | CONSTRUCT CONCRETE AND THRIE BEAM MEDIAN BARRIER | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 2729 | Project ID: 2729 DEA: 050N8504 | 05-SB-101,192-VAR | Construct Curb Ramps And Retaining Walls. | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 2730 | Project ID: 2730 DEA: 050N8704 EFIS: 0500000235 MINOR: 05A1115 | 05-SB-246-13 | CONSTRUCT ROCK SLOPE PROTECTION | 03/20/2020 | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2732 | Project ID: 2732 DEA: 050N9004 MINOR: 05A1118 | 05-SB,SLO,MON-VAR-VAR | REPLACE PAVEMENT MARKERS | 03/19/2020 | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2735 | Project ID: 2735 DEA: 050P0104 | 05-SBt-156-R16.2/R16.9 | RESURFACE ROADWAY | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
