Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13281-13290 of 18859 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210258 | Project ID: 210258 DEA: 100Y9104 EFIS: 1014000063 | 10-MER-91,10-23.3/33.7 | REPAIR FAILED AREAS AND CONSTRUCT RHMA RESURFACING. | MERCED COUNTY AT AND NEAR SNELLING FROM 0.3 MILE NORTH OF OAKDALE ROAD TO LA GRANGE ROAD | 11/14/2016 | 1 (09/23/2015) | Details CEM-3701 Report |
| 209268 | Project ID: 209268 DEA: 10381514 EFIS: 1000000407 | 10-MER-140,165-16.2,26.7/30.0 | PAVEMENT REHABILITATION AND SHOULDER WIDENING. | MERCED COUNTY AT AND NEAR STEVINSON ON RTE 140 AT RTE 165 INTERSECTION AND ON RTE 165 FROM 0.2 MILE SOUTH OF RTE 140 TO 0.2 MILE SOUTH OF WESTSIDE BOULEVARD | 03/24/2016 | 1 (01/06/2014) | Details CEM-3701 Report |
| 994660 | Project ID: 994660 DEA: 101L3304 EFIS: 1020000049 | 10-MER-165-33.2 | INSTALL PEDESTRIAN HYBRID BEACON SYSTEMS. | MERCED COUNTY AT HILMAR AT CAMPBELL STREET | 04/21/2025 | 1 (05/09/2023) | Details CEM-3701 Report |
| 1000761 | Project ID: 1000761 DEA: 101L8704 EFIS: 1020000086 | 10-MER-165-32.9 | INSTALL SIGNAL AND LIGHTING SYSTEM, CURB RAMP, AND ROAD WIDEN. | MERCED COUNTY AT HILMAR AT GEER AVENUE | 1 (11/12/2024) | Details CEM-3701 Report | |
| 1001373 | Project ID: 1001373 DEA: 101M1704 EFIS: 1020000188 | 10-MER-140-43.5/43.9 | CONSTRUCT ROUNDABOUT. | MERCED COUNTY AT PLANADA FROM 0.2 MILE WEST OF PLAINSBURG ROAD TO 0.2 MILE WEST OF STUTTER STREET. | 1 (07/14/2025) | Details CEM-3701 Report | |
| 993589 | Project ID: 993589 DEA: 100T6804 EFIS: 1017000005 | 10-MER-5,165,152,33-Var | SHOULDER AND RAMP WIDENING, COLD PLANE, HMA PAVING AND DIKES. | MERCED COUNTY AT ROUTE 5/165 SEPARATION AND AT ROUTE 152/33 SEPARATION | 03/06/2024 | 1 (03/01/2022) | Details CEM-3701 Report |
| 210509 | Project ID: 210509 DEA: 100X6104 EFIS: 1013000003 | 10-MER-5-21.4 | REHABILITATE BRIDGE DECK AND REPLACE BRIDGE RAILS. | MERCED COUNTY AT SANTA NELLA AT SAN LUIS WASTEWAY BRIDGE | 01/23/2017 | 1 (09/18/2015) | Details CEM-3701 Report |
| 5791 | Project ID: 5791 DEA: 100T4204 | 10-MER-5,59,99,140,152,165-Var | Treat bridge decks with methacrylate and replace joint seals. | MERCED COUNTY AT VARIOUS LOCATIONS | 05/17/2011 | 1 (05/17/2011) | Details CEM-3701 Report |
| 993786 | Project ID: 993786 DEA: 101N4304 EFIS: 1021000185 | 10-MER-5,152-Var | APPLY POLYESTER CONCRETE OVERLAY TO BRIDGE DECKS. | MERCED COUNTY AT VARIOUS LOCATIONS | 09/21/2023 | 1 (04/29/2022) | Details CEM-3701 Report |
| 215426 | Project ID: 215426 DEA: 101C3704 EFIS: 1017000043 | 10-MER-152-26.4/R40.7 | CONSTRUCT MIDWEST GUARDRAIL, CONCRETE BARRIER AND VEGETATION CONTROL. | MERCED COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MIDWAY ROAD TO 0.2 MILE WEST OF ROUTE 59. | 11/09/2021 | 1 (02/01/2021) | Details CEM-3701 Report |
