Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13271-13280 of 18983 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 8142 | Project ID: 8142 DEA: 060M8004 EFIS: 0600020012 | 06-MAD,MAD-65,99-25.2/25.6,23.3/23.8 | CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIER | TULARE AND MADERA COUNTIES ON ROUTE 65 FROM 0.1 MILES NORTH OF AVENUE 196 TO 0.1 MILES SOUTH OF AVENUE 200 AND ON ROUTE 99 FROM 0.2 MILES NORTH OF CALIFA UNDERPASS TO AVENUE 24 OVERCROSSING | 05/28/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3220 | Project ID: 3220 DEA: 060H7204 | 06-TUL-198-R13.7/R16.7 | CONSTRUCT THRIE BEAM AND CONCRETE BARRIER. | TULARE COUNTY NEAR VISALIA FROM ROAD 156 UNDERCROSSING TO ROAD 180 | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 1131 | Project ID: 1131 DEA: 033E2304 | 03-BUT,NEV-80,99-22.4,34.2,34.9 | CONSTRUCT THRIE BEAM AND CONCRETE BARRIER | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 6421 | Project ID: 6421 Permit Numbers: 12066MC0192 12086RT0124 12076RT0747 | 12-ORA-5-35.0 | CONSTRUCT THREE STORM DRAINS SYSTEMS ( TYPE RCP) ; MODIFICATION OF TRAFFIC SIGNALS | ORANGE COUNTY | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 6730 | Project ID: 6730 DEA: 120J9604 COOP: 593a1 | 12-ORA-22-R3.6/R12.7 | Construct three masonry block sound walls | ORANGE COUNTY IN GARDEN GROVE, ORANGE AND SANTA ANA AT VARIOUS LOCATIONS | 12/02/2011 | 1 (12/02/2011) | Details CEM-3701 Report |
| 2292 | Project ID: 2292 DEA: 043S6124 | 04-NAP-128-14.6 | Construct Three Drainage Systems. | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 4991 | Project ID: 4991 DEA: 080K1604 EFIS: 0800000334 MINOR: 08A1707 | 08-RIV-10-15.6 | CONSTRUCT THREE CONCRETE WHEEL CHAIR RAMP AT TRUCK INSPECTION BUILDING | 10/31/2012 | 2 (10/31/2012) | Details CEM-3701 Report | |
| 214680 | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 | 03-SAC-99-7.1/9.4 | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment | 10/30/2020 | 1 (03/02/2020) | Details CEM-3701 Report | |
| 213404 | Project ID: 213404 DEA: 120Q3404 EFIS: 1216000130 Permit Numbers: 1217NMC0723 1218NDP0423 1218NRT0056 | 12-ORA-241-13.1/16.7 | Construct the Oso PWY bridge and extend SR-241 to connect to Los Patrones PKW. in the County of Orange. Two lanes will be constructed of HMA in each direction on SR-241. Oso Parkway N/B on-ramp and S/B off-ramp gores will be modified to connect to new mainline pavement. improve new overhead signs, | OSO PARKWAY INTERCHANGE, COUNTY OF ORANGE | 08/19/2021 | 2 (06/05/2018) | Details CEM-3701 Report |
| 5522 | Project ID: 5522 EFIS: 0000001155 Permit Numbers: 1007NAS0824 10076DP0863 1010NRT0162 | 10-SJ-5-26.47/26.47 | Construct the Morelli Park Boat Launch Facility by Weber Avenue under Interstate 5 right of way in the City of Stockton. No work shall be allowed within the State highway right way until the contractor has provided the Storm Water Pollution Prevention Pla | 1025 W. Weber Avenue, Stockton | 02/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
