Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13231-13240 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994398 | Project ID: 994398 DEA: 07388704 | 07-LA-101-19.7 | CONSTRUCT TEMPORARY CHAIN LINK RAILING AND MINOR CONCRETE. | LOS ANGELES COUNTY IN LOS ANGELES AT LOUISE AVENUE OVERCROSSING | 1 (07/24/2023) | Details CEM-3701 Report | |
| 7653 | Project ID: 7653 DEA: 044S1204 EFIS: 0400001209 | 04-SM-35-25.2 | CONSTRUCT TANGENT WALL AND EMBANKMENT REPAIR | SAN MATEO COUNTY IN SAN BRUNO AT 0.4 MILE NORTH OF SNEATH LANE | 08/22/2018 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7654 | Project ID: 7654 DEA: 044S3704 EFIS: 0400001230 | 04-ALA-580-11.1 | CONSTRUCT TANGENT PILE WALL | ALAMEDA COUNTY IN LIVERMORE ABOUT 0.4 MILE WEST OF ROUTE 580 AND FIRST STREET OVERCROSSING | 01/17/2014 | 1 (10/08/2012) | Details CEM-3701 Report |
| 211695 | Project ID: 211695 DEA: 042K4604 EFIS: 0416000421 | 04-ALA-123-0.2, 0.20 | construct subsurface and hor drains, pavement. | 08/07/2018 | 1 (02/16/2017) | Details CEM-3701 Report | |
| 213646 | Project ID: 213646 DEA: 060W4604 EFIS: 0617000225 | 06-KER-5-12.5 | CONSTRUCT STRUCTURE APPROACH AND PLACE POLYESTER CONCRETE OVERLAY. | KERN COUNTY NEAR GRAPEVINE AT CALIFORNIA AQUEDUCT BRIDGE | 12/04/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
| 214759 | Project ID: 214759 DEA: 010F0804 EFIS: 0115000064 | 01-HUM-96-22.9 | CONSTRUCT STRUCTURAL CONCRETE SOLDIER WALL AND DRILL HOLE FOR PILE. | HUMBOLDT COUNTY IN WEITCHPEC AT PEARSON LANE | 03/09/2022 | 1 (06/17/2020) | Details CEM-3701 Report |
| 993283 | Project ID: 993283 DEA: 044J9804 EFIS: 0416000036 | 04-ALA,SCL-80,880-Var | CONSTRUCT STRUCTURAL CONCRETE CULVERT & MAINTENANCE VEHICLE PULLOUT. | ALAMEDA AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 04/11/2023 | 1 (10/04/2021) | Details CEM-3701 Report |
| 215784 | Project ID: 215784 DEA: 051G2604 EFIS: 0514000131 | 05-SCR-17-9.1/9.9 | CONSTRUCT STRUCTURAL CONCRETE BRIDGE AND ELECTRIFIED BARRIER SYSTEMS. | SANTA CRUZ COUNTY NEAR SCOTTS VALLEY FROM 0.6 MILE SOUTH OF LAUREL ROAD TO 0.2 MILE NORTH OF LAUREL ROAD | 02/14/2024 | 1 (06/21/2021) | Details CEM-3701 Report |
| 215194 | Project ID: 215194 DEA: 101F8304 EFIS: 1016000125 | 10-AMA-49,88-Var | CONSTRUCT STRUCTURAL CONCRETE BRIDGE & BARRIER SLAB; & MINOR CONCRETE. | AMADOR COUNTY AT VARIOUS LOCATIONS. | 08/31/2021 | 1 (10/21/2020) | Details CEM-3701 Report |
| 215210 | Project ID: 215210 DEA: 030J1804 EFIS: 0319000232 | 03-COL-5-6.8 | CONSTRUCT STRUCTURAL CONCRETE BARRIER SLAB AND CONCRETE BARRIER. | COLUSA COUNTY AT HILLGATE ROAD UNDERCROSSING (BRIDGE NO. 15-0047) | 03/01/2022 | 1 (10/05/2020) | Details CEM-3701 Report |
