Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13221-13230 of 17340 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214860 | Project ID: 214860 DEA: 120R8904 EFIS: 1219000051 | 12-ORA-133,5-8.3/10.1,22.7/23.0 | COLD PLANE AC PAVEMENT, PLACE RHMA & THERMOPLASTIC TRAFFIC STRIPING. | ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO MARINE WAY UNDERCROSSING | 01/04/2021 | 1 (12/10/2020) | Details CEM-3701 Report |
7362 | Project ID: 7362 DEA: 120F5504 EFIS: 1200020272 | 12-ORA-405-6.4/7.4 | HIGHWAY PLANTING AND IRRIGATION, GORE PAVING, MVPS AND ACCESS TRAILS. | ORANGE COUNTY IN IRVINE FROM SAN DIEGO CREEK TO VON KARMAN AVENUE OVERCROSSING | 08/28/2017 | 1 (05/21/2012) | Details CEM-3701 Report |
208762 | Project ID: 208762 DEA: 120M4304 | 12-ORA-4,49-0.0/3.5 | CULVERT JOINT SEALING, LINING, CONTACT GROUTING AND INVERT PAVING | ORANGE COUNTY IN IRVINE FROM WALNUT AVENUE OVERCROSSING TO 0.7 MILE NORTH OF PORTOLA PARKWAY OVERCROSSING | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
213857 | Project ID: 213857 DEA: 120Q1304 EFIS: 1216000091 | 12-ORA-261-0.0-0.3 | INSTALL THRIE BEAM MEDIAN BARRIER | ORANGE COUNTY IN IRVINE FROM WALNUT AVENUE OVERCROSSING TO JAMBOREE ROAD OVERCROSSING | 12/12/2019 | 1 (04/16/2019) | Details CEM-3701 Report |
995232 | Project ID: 995232 DEA: 120U1704 EFIS: 1223000051 | 12-ORA-133,261-9.8/12.6,0.0/3.5 | COLD PLANE, OVERLAY, AND REFRESH PAVEMENT DELINEATION. | ORANGE COUNTY IN IRVINE ON ROUTE 133 FROM TECHNOLOGY DRIVE UNDERCROSSING TO PORTOLA PARKWAY UNDERCROSSING AND ON ROUTE 261 FROM WALNUT AVENUE OVERCROSSING TO 0.6 MILE NORTH OF PORTOLA PARKWAY OVERCROSSING | 1 (10/16/2023) | Details CEM-3701 Report | |
6763 | Project ID: 6763 DEA: 120K5004 | 12-ORA-5-23.0/24.8 | LINING AND CLEANING CULVERTS | ORANGE COUNTY IN IRVINE ON ROUTE 5 FROM ROUTE 5/133 SEPARATION TO 0.5 MILE SOUTH OF JEFFRY ROAD | 11/01/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
209179 | Project ID: 209179 DEA: 120M3004 EFIS: 1212000041 | 12-ORA-405,162-0.0/12.9 | COLD PLANE AND OVERLAY WITH RHMA-G AND HMA-O, LOOP DETECTORS | ORANGE COUNTY IN IRVINE, COSTA MESA, AND FOUNTAIN VALLEY FROM ROUTE 5/405 SEPARATION TO 1.0 MILE NORTH OF SANTA ANA RIVER BRIDGE | 04/07/2015 | NOT VERIFIED | Details CEM-3701 Report |
214877 | Project ID: 214877 DEA: 120Q7004 EFIS: 1217000090 | 12-ORA-241-14.5/25.0 | MODIFY LIGHTING SYSTEM, INSTALL GUARDRAIL SYSTEM & CRASH CUSHIONS. | ORANGE COUNTY IN IRVINE, LAKE FOREST, MISSION VIEJO AND RANCHO SANTA MARGARITA FROM OSO PARKWAY TO PORTOLA PARKWAY (IRVINE) OVERCROSSING | 07/08/2022 | 1 (08/13/2020) | Details CEM-3701 Report |
993446 | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 | 12-ORA-55,55-29.6,R6.4/10.3 | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION | 1 (06/24/2022) | Details CEM-3701 Report | |
6747 | Project ID: 6747 DEA: 120K2304 | 12-ORA-90-0.5/2.8 | Cold plane asphalt concrete and place rubberized hot mix asphalt. | ORANGE COUNTY IN LA HABRA AND FULLERTON FROM BEACH BOULEVARD TO 0.3 MILE EAST OF HARBOR BOULEVARD | 12/02/2011 | 1 (12/02/2011) | Details CEM-3701 Report |