Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13141-13150 of 19515 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6482 | Project ID: 6482 DEA: 120A7614 | 12-ORA-405-25.6/26.3 | Add an off ramp channelization lane | 07/13/2007 | 1 (10/30/2008) | Details CEM-3701 Report | |
| 6481 | Project ID: 6481 DEA: 120A7304 | 12-ORA-5-22.2 | PLANTING AND IRRIGATION | IN ORANGE COUNTY IN IRVINE ANDTUSTIN FROM 0.3 KM SOUTH OF ALTON PARKWAY OVERCROSSING TO 0.3 KMNORTH OF TUSTIN RANCH ROAD OVERCROSSING | 04/18/2012 | 1 (04/18/2012) | Details CEM-3701 Report |
| 6480 | Project ID: 6480 DEA: 120A4704 | 12-ORA-5- 2.8 | CONSTRUCT RETAINING WALL | IN ORANGE COUNTY IN SAN CLEMENTE AT AVENIDA PALIZADA NORTHBOUND ON RAMP | 06/29/2007 | 1 (10/31/2008) | Details CEM-3701 Report |
| 6479 | Project ID: 6479 DEA: 120A3904 | 12-ORA-5- 7.3 | REALIGN RAMP AND EXTEND RAMP METER | IN ORANGE COUNTY IN SAN JUANCAPISTRANO ON ROUTE 5 AT STONEHILLDRIVE AND CAMINO CAPISTRANO NORTHBOUND SERRA ON RAMP | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 6478 | Project ID: 6478 DEA: 120A1144 MINOR: 12A1142 | 12-ORA-6641- | INSTALL UTILITIES , CONSTRUCT DRAINAGE AND PAVEMENT IMPROVEMENTS FOR OFFICE TRAILERS | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report | |
| 6477 | Project ID: 6477 DEA: 120A1024 MINOR: 12A1024 | 12-ORA-91-11.8/20.1 | MODIFY COMMUNCATION SYSTEM | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report | |
| 6476 | Project ID: 6476 DEA: 120A1014 MINOR: 12A1019 | 12-ORA-57,405,91-VAR | FIBER OPTIC COMMUNICATION SYSTEM | 09/28/2012 | NOT VERIFIED | Details CEM-3701 Report | |
| 6475 | Project ID: 6475 EFIS: 0000001155 Permit Numbers: 1209NMC0357 | 12-ORA-90-5.625/5.8125 | improve the intersection capacity at the Associated Road intersection as part of the Imperial Highway (SR-90) Smart Street Project (Segment D).Improvements within the State right of way will include but not limited to: drainage and traffic signal modification | imperial highway, Brea | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 6474 | Project ID: 6474 DEA: 120164M4 EFIS: 1200000017 COOP: 120531 Permit Numbers: 1209NMC0354 | 12-ORA-90-.4/2.7 | Improve the intersection capacities at the Beach Blvd. (SR-39), Idaho Street, Euclid Street, and Harbor Blvd. intersections as part of the Imperial Highway (SR-90) Smart Street Project - from L.A./ Orange County line to east of Harbor Blvd, (Segment A) | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 6473 | Project ID: 6473 EFIS: 0000001155 Permit Numbers: 1209NMC0269 | 12-ORA-91-4.26/4.26 | widen East Street/Raymond Avenue by providing one additional lane between the eastbound and the westbound ramps intersections. Charge EA #12-0G0073 | east street, Anaheim Raymond avenue on pavement. Charge EA#12-0G0073 | 09/08/2016 | 1 (08/01/2013) | Details CEM-3701 Report |
