Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13141-13150 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5228 | Project ID: 5228 DEA: 08334864 EFIS: 0800000603 | 08-RIV-60,91,215-11.5/12.2,20.3/21.6,43.1/43.9 | CONSTRUCT WALLS, REPLACE HIGHWAY PLANTING AND IRRIGATION | RIVERSIDE COUNTY IN RIVERSIDE ON ROUTE 215 FROM DOWN STREET OVERHEAD TO COLOMBIA AVENUE OVERCROSSING ON ROUTE 60 FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO 215/60/91 SEPARATION ON ROUTE 91 FROM 0.2 MILE SOUTH OF UNIVERSITY AVENUE UNDERCROSSING TO 2 | 12/07/2015 | 1 (02/21/2011) | Details CEM-3701 Report |
| 6056 | Project ID: 6056 DEA: 11246524 | 11-SD-75-75 | CONSTRUCT WALKWAY EXTENSION | IN SAN DIEGO COUNTY IN SAN DIEGO AT THE SAN DIEGO AND CORONADO BAYBRIDGE AND AT THE SAN DIEGO MAINTENANCE YARD | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 1347 | Project ID: 1347 DEA: 04013014 | 04-CC-80-22.2/ | CONSTRUCT VISTA POINT | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 1349 | Project ID: 1349 DEA: 040130E4 | 04-CC-80-12.6 | CONSTRUCT VISTA POINT | IN CONTRA COSTA COUNTY NEAR CROCKETT ON SAN PABLO AVENUE TO 0.7 KM WEST OF THE CROCKETT OFF RAMP | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 1742 | Project ID: 1742 DEA: 040T0424 | 04-SON-37- 6.0 | CONSTRUCT VIEW AREA | IN SONOMA COUNTY 3.2 KM EAST OF TOLAY CREEK AT THE SONOMA CREEK BRIDGE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 210277 | Project ID: 210277 DEA: 051F8904 EFIS: 0514000072 | 05-MON-1-28.0/28.4 | CONSTRUCT VIADUCT. | MONTEREY COUNTY NEAR LUCIA FROM 0.1 MILE SOUTH OF BIG CREEK BRIDGE TO 2.8 MILES SOUTH OF DOLAN CREEK BRIDGE | 02/01/2018 | 1 (06/01/2015) | Details CEM-3701 Report |
| 212523 | Project ID: 212523 DEA: 033H3504 EFIS: 0317000327 | 03-SIE-49-45.19 | Construct Viaduct and re-establish both lanes of travel | 01/15/2019 | 1 (08/01/2017) | Details CEM-3701 Report | |
| 7377 | Project ID: 7377 DEA: 051A6904 EFIS: 0512000008 | 05-MON-1-58.3,59.9 | CONSTRUCT VIADUCT | MONTEREY COUNTY ABOUT 15 MILES SOUTH OF CARMEL AT 0.1 MILE SOUTH OF ROCKY CREEK BRIDGE AND AT 1.1 MILE SOUTH OF BIXBY CREEK BRIDGE | 05/19/2014 | 1 (10/01/2012) | Details CEM-3701 Report |
| 5631 | Project ID: 5631 DEA: 100M5104 | 10-AMA-49-0.9 | CONSTRUCT VEHICLE TURNOUT AND RETAINING WALL | 04/17/2011 | 1 (11/03/2008) | Details CEM-3701 Report | |
| 211988 | Project ID: 211988 DEA: 081C5104 EFIS: 0812000324 | 08-RIV-74-17.4/17.8 | CONSTRUCT VEHICLE RINSE FACILITY | RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE AT THE ELSINORE MAINTENANCE STATION AND FROM DEXTER AVENUE TO CONRAD AVENUE | 06/23/2021 | 1 (08/08/2017) | Details CEM-3701 Report |
