Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13131-13140 of 18859 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1001737Project ID: 1001737
DEA: 040A53A4
EFIS: 0424000468
COOP: 043071
04-SOL-SR12,I80-1.917/10.932/2.562/11.825Construction of a new partial interchange on SR12 (West) at Red Top Road, reconstruction of the I-80/Red Top Road Interchange, a new connector from the new partial interchange on SR 12 to Red Top Road at I-80, etcRed Top Road in Solano County near Fairfield. 2 (12/04/2025)Details CEM-3701 Report
6024Project ID: 6024
DEA: 11167894
EFIS: 1100000084
11-IMP-78,86-R14.6/R19.5,38.3/39.1CONSTRUCTION OF A NEW 4-LANE WITH HMA AND CRCP.IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 FROM ROUTE 86 TO 0.6 KM EAST OF HOVLEY ROAD AND ON ROUTE 86 FROM 0.5 KM SOUTH TO 0.1 KM NORTH OF FREDRICKS ROAD01/04/20131 (02/22/2012)Details CEM-3701 Report
1524Project ID: 1524
EFIS: 0000001155
Permit Numbers: 0407NDP0615
04-SCL-152,156-21.7/R22.7CONSTRUCTION OF A DIRECT CONNECTOR FLYOVER AND AN INTERCHANGE 05/04/2011NOT VERIFIEDDetails CEM-3701 Report
2513Project ID: 2513
EFIS: 0000001155
Permit Numbers: 0508NMC0168
05-SCR-1-17.42Construction of a 11.5′ wide bike path, 133′ long retaining wall,, 292′ long cut-off wall, a 54′ long, 10′ wide prefabricated bicycle-pedestrian bridge under San Lorenzo Bridge on Highway 1. 04/29/2011NOT VERIFIEDDetails CEM-3701 Report
1001241Project ID: 1001241
Permit Numbers: 1124NMC0657
11--N,A-Construction of 3.5-mile on-street bikeway. Includes installation of pedestrian push button poles and electrical poles.Imperial Avenue from 17th Street to 47th Street in San Diego. Will intersect state highways at 3 locations. 2 (02/26/2025)Details CEM-3701 Report
995169Project ID: 995169
DEA: 081K4024
EFIS: 0820000074
COOP: 081701
08-RIV-I-15-3.9Construction of 12 ft wide aux lane with 10 ft right shoulder on northbound I-15. Embankment excavation and construction of retaining wall in front of Santiago Road overcrossing abutment.NB I-15 between Temecula Parkway and Rancho California Road 2 (09/21/2023)Details CEM-3701 Report
210720Project ID: 210720
DEA: 051E0604
EFIS: 0513000030
05-MON-101-47.7/53.9CONSTRUCTION MEDIAN BARRIER, WIDEN SHOULDER AND RUMBLE STRIPSMONTEREY COUNTY IN AND NEAR GREENFIELD FROM TEAGUE AVENUE TO WALNUT AVE OVERCROSSING08/01/20181 (10/23/2015)Details CEM-3701 Report
994982Project ID: 994982
DEA: 09363604
EFIS: 0914000029
09-INY-395-22.8/22.3Construction hot mix asphalt shoulderState Highway In Inyo County About 14 Miles South of Olancha from 1.4 Miles South to 1.6 Miles South of Haiwee Powerhouse Road. 1 (08/10/2023)Details CEM-3701 Report
214890Project ID: 214890
DEA: 080A4414
EFIS: 0818000047
COOP: 081894
08-RIV-I-15-17.6/19.6Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. 2 (03/26/2020)Details CEM-3701 Report
2525Project ID: 2525
EFIS: 0000001155
Permit Numbers: 05096TK0361 05096DP0438
05-MON-183-R7.63/R7.63construction area signage for local road work 05/04/2011NOT VERIFIEDDetails CEM-3701 Report