Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13131-13140 of 18859 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001737 | Project ID: 1001737 DEA: 040A53A4 EFIS: 0424000468 COOP: 043071 | 04-SOL-SR12,I80-1.917/10.932/2.562/11.825 | Construction of a new partial interchange on SR12 (West) at Red Top Road, reconstruction of the I-80/Red Top Road Interchange, a new connector from the new partial interchange on SR 12 to Red Top Road at I-80, etc | Red Top Road in Solano County near Fairfield. | 2 (12/04/2025) | Details CEM-3701 Report | |
| 6024 | Project ID: 6024 DEA: 11167894 EFIS: 1100000084 | 11-IMP-78,86-R14.6/R19.5,38.3/39.1 | CONSTRUCTION OF A NEW 4-LANE WITH HMA AND CRCP. | IMPERIAL COUNTY NEAR BRAWLEY ON ROUTE 78 FROM ROUTE 86 TO 0.6 KM EAST OF HOVLEY ROAD AND ON ROUTE 86 FROM 0.5 KM SOUTH TO 0.1 KM NORTH OF FREDRICKS ROAD | 01/04/2013 | 1 (02/22/2012) | Details CEM-3701 Report |
| 1524 | Project ID: 1524 EFIS: 0000001155 Permit Numbers: 0407NDP0615 | 04-SCL-152,156-21.7/R22.7 | CONSTRUCTION OF A DIRECT CONNECTOR FLYOVER AND AN INTERCHANGE | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 2513 | Project ID: 2513 EFIS: 0000001155 Permit Numbers: 0508NMC0168 | 05-SCR-1-17.42 | Construction of a 11.5′ wide bike path, 133′ long retaining wall,, 292′ long cut-off wall, a 54′ long, 10′ wide prefabricated bicycle-pedestrian bridge under San Lorenzo Bridge on Highway 1. | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 1001241 | Project ID: 1001241 Permit Numbers: 1124NMC0657 | 11--N,A- | Construction of 3.5-mile on-street bikeway. Includes installation of pedestrian push button poles and electrical poles. | Imperial Avenue from 17th Street to 47th Street in San Diego. Will intersect state highways at 3 locations. | 2 (02/26/2025) | Details CEM-3701 Report | |
| 995169 | Project ID: 995169 DEA: 081K4024 EFIS: 0820000074 COOP: 081701 | 08-RIV-I-15-3.9 | Construction of 12 ft wide aux lane with 10 ft right shoulder on northbound I-15. Embankment excavation and construction of retaining wall in front of Santiago Road overcrossing abutment. | NB I-15 between Temecula Parkway and Rancho California Road | 2 (09/21/2023) | Details CEM-3701 Report | |
| 210720 | Project ID: 210720 DEA: 051E0604 EFIS: 0513000030 | 05-MON-101-47.7/53.9 | CONSTRUCTION MEDIAN BARRIER, WIDEN SHOULDER AND RUMBLE STRIPS | MONTEREY COUNTY IN AND NEAR GREENFIELD FROM TEAGUE AVENUE TO WALNUT AVE OVERCROSSING | 08/01/2018 | 1 (10/23/2015) | Details CEM-3701 Report |
| 994982 | Project ID: 994982 DEA: 09363604 EFIS: 0914000029 | 09-INY-395-22.8/22.3 | Construction hot mix asphalt shoulder | State Highway In Inyo County About 14 Miles South of Olancha from 1.4 Miles South to 1.6 Miles South of Haiwee Powerhouse Road. | 1 (08/10/2023) | Details CEM-3701 Report | |
| 214890 | Project ID: 214890 DEA: 080A4414 EFIS: 0818000047 COOP: 081894 | 08-RIV-I-15-17.6/19.6 | Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15 | Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. | 2 (03/26/2020) | Details CEM-3701 Report | |
| 2525 | Project ID: 2525 EFIS: 0000001155 Permit Numbers: 05096TK0361 05096DP0438 | 05-MON-183-R7.63/R7.63 | construction area signage for local road work | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report |
