Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13111-13120 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995370 | Project ID: 995370 DEA: 072XG004 EFIS: 0723000145 | 07-LA-2-40.3/46.1 | Remove the mudslide and rock slide behind the catchment wall, perform rock scaling, reconstruct the slope drapery protection system, rebuild the damaged slope with geogrid and subdrains, repair/replace the washed out roadway, construct earth berms and place erosion control on the washed out slopes | 11/07/2024 | 1 (01/22/2024) | Details CEM-3701 Report | |
| 993909 | Project ID: 993909 DEA: 120T8504 EFIS: 1222000108 | 12-ORA/ORA-5,22,405-42.0/42.0, 10.43/10.43, .95/.95 | Remove the old failed joint assembly units placing new steel joint assembly units, place trafficrated steel plates over the failed joint assembly units | 12/02/2022 | 1 (07/26/2022) | Details CEM-3701 Report | |
| 714 | Project ID: 714 DEA: 024E1504 EFIS: 0200020211 | 02-TRI-299-28.8 | Remove the rock over hang, cut slope back, repair roadway surface | 2 mile east of North Fork Trinity River Bridge | 11/05/2020 | 1 (12/28/2010) | Details CEM-3701 Report |
| 994035 | Project ID: 994035 DEA: 051M2004 EFIS: 0519000081 | 05-SCR-17-3.50 | Remove thrie beam median barrier/replace w/ zoneguard barrier. Repair bridge closure slab | 09/19/2022 | 1 (06/17/2022) | Details CEM-3701 Report | |
| 213889 | Project ID: 213889 DEA: 030H5104 EFIS: 0315000201 | 03-YUB-70-R11.0/13.6 | REMOVE THRIE-BEAM MEDIAN BARRIER & INSTALL CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 0.3 MILE SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 05/11/2020 | 1 (02/21/2019) | Details CEM-3701 Report |
| 215207 | Project ID: 215207 Permit Numbers: 0420NMC0200 | 04-ALA--20.03 | Remove traffic signal pole within Caltrans ROW Install new pole outside Caltrans ROW Install conduits connecting new traffic signals Replace concrete sidewalk Install new accessible ramps, curb/gutter HMA paving Replace concrete striping | Hesperian Blvd, San Lorenzo | 10/14/2022 | 1 (10/01/2020) | Details CEM-3701 Report |
| 212972 | Project ID: 212972 DEA: 051J7204 | 05-MON,SBT-101-32.0/101.4,0.0/7.5 | REMOVE TRAFFIC STRIPE AND PLACE 6" TRAFFIC STRIPE. | MONTEREY AND SAN BENITO COUNTIES FROM ROUTE 101/198 SEPARATION TO THE SAN BENITO COUNTY LINE | 12/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212973 | Project ID: 212973 DEA: 051J7304 EFIS: 0518000037 | 05-SB,SLO-101-0.0/91.0,0.0/0.8 | REMOVE TRAFFIC STRIPE AND PLACE 6" TRAFFIC STRIPE. | SANTA BARBARA AND SAN LUIS OBISPO COUNTIES FROM THE VENTURA COUNTY LINE TO ROUTE 101/166 SEPARATION | 09/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212974 | Project ID: 212974 DEA: 051J7404 EFIS: 0518000038 | 05-SLO,MON-101-0.8/69.3,R0.0/R32.0 | REMOVE TRAFFIC STRIPE AND PLACE 6" TRAFFIC STRIPE. | SAN LUIS OBISPO AND MONTEREY COUNTIES FROM ROUTE 101/166 SEPARATION TO ROUTE 101/198 SEPARATION | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 213030 | Project ID: 213030 DEA: 060X5104 EFIS: 0618000081 | 06-KER-5-43.3/52.8 | REMOVE TRAFFIC STRIPE AND PLACE 6" TRAFFIC STRIPE. | KERN COUNTY NEAR BUTTONWILLOW FROM 0.3 MILE NORTH OF KERN RIVER UTILITY ROAD OVERCROSSING TO 0.7 MILE NORTH OF ROUTE 5/58 SEPARATION | 09/05/2018 | NOT VERIFIED | Details CEM-3701 Report |
