Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13101-13110 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2121 | Project ID: 2121 DEA: 042A0104 EFIS: 0400000804 COOP: 2087A1 | 04-SOL-80-20.6/21.24 | I-80/ NORTH TEXAS INTERCHANGE IMPROVEMENTS | 07/12/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 2122 | Project ID: 2122 DEA: 042A0204 | 04-ALA-VAR-0.0 | UPGRADE ADOPT A HIGHWAY SIGNS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2125 | Project ID: 2125 DEA: 042A0704 EFIS: 0400020592 | 04-SCL-101-33.0/ 33.0 | REPLACE THE GIRDERS BETWEEN BENT 3 AND ABUTMENT 5. | 12/23/2024 | 1 (05/03/2011) | Details CEM-3701 Report | |
| 2126 | Project ID: 2126 DEA: 042A0904 EFIS: 0400000807 | 04-CC-680-24.9 | CLOSEOUT | 03/18/2025 | 1 (07/05/2011) | Details CEM-3701 Report | |
| 2131 | Project ID: 2131 DEA: 042A4604 | 04-MRN-37-12.0/13.7 | DOUBLE THRIE BEAM BARRIER | 04/18/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2138 | Project ID: 2138 DEA: 042A6904 | 04-ALA-580,84- | TREAT BRIDGE DECK WITH METHACRYLATE RESIN AND REPLACE JOINT SEALS | 04/20/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 2141 | Project ID: 2141 DEA: 042A7204 | 04-CC-680-R1.1,22.7 | TREAT BRIDGE DECKS WITH METHACRYLATE RESIN AND REPLACE JOINT SEALS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2142 | Project ID: 2142 DEA: 042A7304 | 04-MRN,SON-101,37-VAR | TREAT BRIDGE DECK WITH METHACRYLATE AND RESIN AND REPAIR JOINT SEAL | 08/16/2013 | 1 (04/18/2011) | Details CEM-3701 Report | |
| 2146 | Project ID: 2146 DEA: 042A7704 | 04-SM-101-11.9/23.7 | TREAT BRIDGE DECK AND JOINT SEALS | 04/20/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 2152 | Project ID: 2152 DEA: 042A9904 | 04-SF-280-0.0/7.5 | GRIND EXISTING PAVEMENT AND HOT MIX ASPHALT SURFACING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
