Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13081-13090 of 18758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
995112Project ID: 995112
DEA: 07373504
EFIS: 0720000275
COOP: 075223
07-LA-I-210-18.5-20.3Construction of four (4) sound wall segments along the Interstate 210 FreewayI-210 Freeway, City of La Canada Flintridge 2 (07/25/2025)Details CEM-3701 Report
3621Project ID: 3621
EFIS: 0000001155
Permit Numbers: 07076MC1569
07-LA-710-T32.105CONSTRUCTION OF DUAL RIGHT-TURN LANES, TRAFFIC SIGNAL MODIFICATIONS, CURB RAMP CONSTRUCTION, ETC., IN THE CITY OF PASADENA.ROUTE 710 (PASADENA AVE.) AND DEL MAR BOULEVARD.12/28/20121 (12/28/2012)Details CEM-3701 Report
209334Project ID: 209334
DEA: 060S3304
EFIS: 0614000113
COOP: 061574
06-KER-49-29.9/30.5Construction of Curbs and Gutters0.1 miles west of California Aqueduct to Lost Hills Road12/14/20202 (12/22/2014)Details CEM-3701 Report
1765Project ID: 1765
EFIS: 0000001155
Permit Numbers: 0410NMC0628
04-MRN-101-18.6/19.1Construction of class 1 bike path 3,200 in length.US Highway 101, Novato01/21/2019NOT VERIFIEDDetails CEM-3701 Report
1788Project ID: 1788
EFIS: 0000001155
Permit Numbers: 04116DP0879
04-MRN-101-18.6/19.1Construction of class 1 bike path 3,200 in length. 01/21/2019NOT VERIFIEDDetails CEM-3701 Report
1351Project ID: 1351
DEA: 04014004
EFIS: 0400000035
04-ALA--0000.0/0000.0CONSTRUCTION OF BUILDING & ROADS RENNOVATION OF EXISTING KEY SYSTEM 03/18/20251 (07/11/2007)Details CEM-3701 Report
1001735Project ID: 1001735
DEA: 042Y1104
EFIS: 0423000071
04-CC-680-16.4/16.4CONSTRUCTION OF BICYCLE INFRASTRUCTURE AND PEDESTRIAN ENHANCEMENTS ALONG THE TREAT BOULEVARD CORRIDORWalnut Creek- Treat Boulevard Corridor, from North Main Street to Jones Road, NOT VERIFIEDDetails CEM-3701 Report
215678Project ID: 215678
Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668
04-SM-82,280-23.5-23.7/M27.16R,R25.98Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk.San Pedro Rd. to A St., San Mateo County & Daly City03/13/20231 (04/14/2021)Details CEM-3701 Report
211022Project ID: 211022
DEA: 100T8104
10-MER-59,99,140,152-VariesCONSTRUCTION OF ADA CURB RAMPS.IN MERCED COUNTY ON STATE ROUTES 59, 99, 140 AND 152 AT VARIOUS11/07/20161 (02/17/2016)Details CEM-3701 Report
211177Project ID: 211177
Permit Numbers: 04156DP2439 0414NSN1508
04-SCL-680-1.2/1.2Construction of a traffic signal for the southbound on-ramp to Route to Route 680 from Jackson Ave, including curb return modifications,striping and signing.Jackson Ave, San Jose01/18/20191 (02/02/2016)Details CEM-3701 Report