Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13061-13070 of 17395 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214253 | Project ID: 214253 DEA: 051J0404 EFIS: 0517000054 | 05-SLO,MON-46,101-49.5,R3.1/R5.2 | INSTALL ELECTRIC VEHICLE CHARGING STATIONS. | SAN LUIS OBISPO AND MONTEREY COUNTIES ON ROUTE 46 AT SHANDON SAFETY ROADSIDE REST AREA AND ON ROUTE 101 AT CAMP ROBERTS SAFETY ROADSIDE REST AREAS | 09/25/2020 | 1 (09/06/2019) | Details CEM-3701 Report |
214254 | Project ID: 214254 DEA: 05448214 EFIS: 0516000043 | 05-SB-101-2.2/3.3 | INVASIVE PLANT MANAGEMENT, INSTALL IRRIGATION AND PLANTING. | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE | 06/26/2023 | 1 (09/06/2019) | Details CEM-3701 Report |
214255 | Project ID: 214255 DEA: 07304104 EFIS: 0714000057 | 07-LA-91-R14.1/R15.2 | CONSTRUCT MAINTENANCE VEHICLE PULLOUTS. | LOS ANGELES COUNTY IN AND NEAR BELLFLOWER FROM 0.1 MILE WEST OF DOWNEY AVENUE UNDERCROSSIGN TO 0.2 MILE EAST OF CLARK AVENUE UNDERCROSSING | 11/29/2021 | 1 (12/10/2019) | Details CEM-3701 Report |
214256 | Project ID: 214256 DEA: 07317404 EFIS: 0715000241 | 07-LA-105-R7.8/R10.3 | SLOPE STABILIZATION AND EROSION CONTROL. | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND AT WILLOWBROOK FROM MAIN STREET UNDERCROSSING TO MONA BOULEVARD | 1 (04/07/2021) | Details CEM-3701 Report | |
214257 | Project ID: 214257 DEA: 09372704 EFIS: 0917000054 | 09-KER,INY-58,395-Var | CONSTRUCT ELECTRIC VEHICLE CHARGING STATION SYSTEM AND PLACE PCC. | KERN AND INYO COUNTIES AT VARIOUS LOCATIONS | 01/14/2021 | 1 (12/12/2019) | Details CEM-3701 Report |
214258 | Project ID: 214258 DEA: 101G7214 EFIS: 1018000067 | 10-MER,SJ-5,99-0.4/0.9,30.9 | INSTALL ZEV CHARGING STATIONS. | MERCED AND SAN JOAQUIN COUNTIES AT VARIOUS LOCATIONS ON ROUTE 5 AT JOHN "CHUCK" ERRECA REST AREA AND ON ROUTE 99 AT LODI PARK AND RIDE | 03/25/2022 | 1 (07/22/2019) | Details CEM-3701 Report |
214259 | Project ID: 214259 DEA: 120N9204 EFIS: 1215000010 | 12-ORA-22-R9.1 | UPGRADE DRAINAGE SYSTEM. | ORANGE COUNTY IN GARDEN GROVE AT HASTER STREET OFF-RAMP | 10/25/2022 | 1 (10/28/2019) | Details CEM-3701 Report |
214260 | Project ID: 214260 DEA: 120Q3004 EFIS: 1216000123 | 12-ORA-5-37.4 | MODIFY ELECTRICAL SYSTEM AND PLACE HIGH FRICTION SURFACE TREATMENT. | ORANGE COUNTY IN ANAHEIM AT HARBOR BOULEVARD OVERCROSSING | 06/25/2021 | 1 (09/12/2019) | Details CEM-3701 Report |
214261 | Project ID: 214261 DEA: 06484604 EFIS: 0600000484 COOP: 061726 | 06--,99- | The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit | n Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 | 2 (08/05/2019) | Details CEM-3701 Report | |
214262 | Project ID: 214262 Permit Numbers: 0419NMC0761 0419NRT1587 | 04---10.8 | The City of Milpitas proposes to rehalabilitate three (3) road segments. | McCarthy Blvd, Hillview Dr and Jacklin Rd, Milpitas | 2 (08/19/2019) | Details CEM-3701 Report |