Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13041-13050 of 18986 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213037 | Project ID: 213037 DEA: 120R0704 EFIS: 1218000030 | 12-ORA-5-0.0/44.4 | REMOVE AND REPLACE PAVEMENT DELINEATION | ORANGE COUNTY IN SAN CLEMENTE, SAN JUAN CAPISTRANO, MISSION VIEJO, LAGUNA NIGUEL, LAGUNA HILLS, LAKE FOREST, IRVINE, TUSTIN, SANTA ANA, ANAHEIM, FULLERTON, AND BUENA PARK FROM SAN DIEGO TO LOS ANGELES COUNTY LINE | 07/02/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
| 213083 | Project ID: 213083 DEA: 112N0284 EFIS: 1118000042 | 11-SD-5-R0.3/R29.5 | REMOVE AND REPLACE PAVEMENT DELINEATION | IN SAN DIEGO COUNTY ON ROUTE 5 FROM THE USA/MEXICO BORDER TO GENESEE AVENUE OVERCROSSING | 12/31/2019 | 1 (04/26/2018) | Details CEM-3701 Report |
| 6761 | Project ID: 6761 DEA: 120K4504 | 12-ORA-5-31.4/42.5 | REMOVE AND REPLACE PAVEMENT DELINEATION. | IN ORANGE COUNTY, IN SANTA ANA, ANAHEIM, AND BUENA PARK, FROM 0.4 MILE SOUTH OF GRAND AVENUE UNDERCROSSING TO 0.6 MILE NORTH OF MAGNOLIA AVENUE OVERCROSSING | 08/30/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
| 213859 | Project ID: 213859 DEA: 120R4804 | 12-ORA-91-R0.0/R10.3 | REMOVE AND REPLACE PAVEMENT DELINEATION. | ORANGE COUNTY FROM LOS ANGELES COUNTY LINE IN LA PALMA TO 0.2 MILE EAST OF LAKEVIEW AVENUE OVERCROSSING IN ANAHEIM | 11/12/2019 | 1 (10/08/2019) | Details CEM-3701 Report |
| 214792 | Project ID: 214792 DEA: 120R9104 EFIS: 1219000053 | 12-ORA-22-R0.7/R13.1 | REMOVE AND REPLACE PAVEMENT DELINEATION. | ORANGE COUNTY FROM ROUTE 22/405 SEPARATION IN WESTMINSTER TO ROUTE 22/55 SEPARATION IN ORANGE | 01/04/2021 | 1 (05/11/2020) | Details CEM-3701 Report |
| 994815 | Project ID: 994815 DEA: 101P3704 EFIS: 1022000114 MINOR: 10A2456 | 10--- | Remove and Replace Pavement Markers and Striping | State Highway In Merced, San Joaquin, and Stanislaus Counties at Various Locations. District-County-Route-Post Mile: 10 - Mer, SJ, Sta - 4, 5, 99, 205 - PM Various | 1 (05/22/2023) | Details CEM-3701 Report | |
| 995140 | Project ID: 995140 DEA: 09393404 EFIS: 0922000031 MINOR: 09A0930 | 09--14,178,- | Remove and replace pavement markings and signs | Construction on State Highway in Kern County at Various Locations on Routes 14, 178 & 202. | 1 (09/08/2023) | Details CEM-3701 Report | |
| 994495 | Project ID: 994495 Permit Numbers: 0221NCS0246 | 02---22.223/-1 | Remove and replace pavement, curb, gutter, sidewalk, curb ramp, intersection signal poles, utility boxes, and signalization equipment; Install new curb, gutter, sidewalk, and pedestrian crossing at post mile 22.223 in Redding, Shasta County. | Highway 299/Buenaventura, Redding | 06/13/2024 | 1 (02/15/2023) | Details CEM-3701 Report |
| 1000872 | Project ID: 1000872 DEA: 113A7534 EFIS: 1124000149 MINOR: 11A3936 | 11-SD-905-4.895 | Remove and replace PCC on EB SR-905 connector to NB I-805. Fog seal existing shoulder. Remove and replace existing dike type D. | On San Diego County on Eastbound SR-905 connector to Northbound I-805 - Ramp Pavement Rehabilitation. | 1 (12/30/2024) | Details CEM-3701 Report | |
| 5155 | Project ID: 5155 DEA: 080P9704 | 08-RIV-91-R1.0/R3.0 | Remove and replace pcc slabs | In Riverside County in Corona at Route 71/91 Separation | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
