Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13031-13040 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211814 | Project ID: 211814 DEA: 031E7604 EFIS: 0300000273 | 03-YUB-20,70-0.5/0.9,14.3/14.4 | REMOVE MEDIAN LANES, ADD LEFT TURN LANES, CHANNELIZE, MODIFY SIGNALS | YUBA COUNTY IN MARYSVILLE ON ROUTE 20 FROM THE FEATHER RIVER BRIDGE AND OVERHEAD TO F STREET AND ON ROUTE 70 AT 4TH STREET TO 5TH STREET | 08/30/2018 | 1 (10/20/2016) | Details CEM-3701 Report |
| 212281 | Project ID: 212281 Permit Numbers: 11146MC0753 | 11--805-25.48 | remove median, construct left turn storage, grind and overlay | Route 5 and 805 at Nobel Drive I-5. PM 28.16 I-805 PM 25.48 | 08/07/2018 | 1 (03/28/2017) | Details CEM-3701 Report |
| 213852 | Project ID: 213852 DEA: 034F6004 EFIS: 0314000228 | 03-NEV-80-1.2/R9.4 | REMOVE METAL BEAM GUARD RAIL AND REPLACE WITH CONCRETE BARRIER | NEVADA COUNTY IN AND NEAR TRUCKEE AT VARIOUS LOCATIONS FROM 1.3 MILES WEST OF SODA SPRINGS OVERCROSSING TO 0.3 MILE EAST OF DONNER LAKE UNDERCROSSING | 05/26/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
| 209102 | Project ID: 209102 DEA: 080N5104 EFIS: 0800001008 | 08-RIV,SBD-116,121-51.5/51.7,1.8/2.2 | REMOVE METAL BEAM GUARD RAILING AND PLACE CONCRETE BARRIER (TYPE 732B) | RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR ONTARIO FROM 0.1 MILE SOUTH TO 0.1 MILE NORTH OF 15/60 SEPARATION AND FROM 0.6 MILE SOUTH TO 0.2 MILE SOUTH OF 15/10 SEPARATION | 08/29/2014 | 1 (04/15/2014) | Details CEM-3701 Report |
| 212572 | Project ID: 212572 DEA: 030G9404 EFIS: 0317000204 | 03-SAC,YOL/SAC-5,50-2.4/L0.7 | Remove MLS and 1" polyester concrete overlay on Pioneer Bridge in Sacramento, CA. | Sacramento, CA | 04/16/2021 | 1 (07/12/2017) | Details CEM-3701 Report |
| 995338 | Project ID: 995338 DEA: 072XE404 EFIS: 0723000093 | 07-VEN-150-0/20 | Remove mud and debris from roadway, rebuild eroded side slopes, protect side slopes (erosion control), repair the damaged shoulder and AC dike in multiple locations, clean the drainage systems, channel, and debris against the Br. No 52-0244, reinstall the roadside signs and markers, replace the fail | 06/09/2025 | 1 (11/27/2023) | Details CEM-3701 Report | |
| 212073 | Project ID: 212073 DEA: 032H7204 | 03-NEV-80-R9.2/R9.6 | remove mudslide | 08/06/2019 | 1 (09/15/2017) | Details CEM-3701 Report | |
| 212056 | Project ID: 212056 DEA: 033H7204 EFIS: 0318000054 | 03-BUT-80-R9.2/R9.6 | remove mudslide -Construct TWLTL/turn pockets, widen shoulders, provide improved access for bicyclists/pedestrians, establish a clear recovery zone of 20 feet, and rehabilitate Class II pavement | 08/24/2022 | 1 (04/26/2018) | Details CEM-3701 Report | |
| 212707 | Project ID: 212707 DEA: 033H8104 | 03-NEV,NEV/SIE-50,80-31.0/31.78;0.0/1.59 | Remove mudslide debris and protect highway from post-fire debris flow from Farad Fire | 01/02/2019 | 1 (09/18/2017) | Details CEM-3701 Report | |
| 212072 | Project ID: 212072 DEA: 032H8304 EFIS: 0317000188 | 03-SIE-49-0.0/23.3 | remove mudslides, repair roadway & shoulder | 08/06/2019 | 1 (09/15/2017) | Details CEM-3701 Report |
