Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13021-13030 of 18758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
2276Project ID: 2276
DEA: 043S3004
EFIS: 0400000992
04-SON-128-1.28SLOPE REPAIR - RTE 128 TIE BACK SOLIDER PILE WALL 08/20/20191 (12/13/2006)Details CEM-3701 Report
2277Project ID: 2277
DEA: 043S4204
04-SM-1-39.7/40.9RETAINING WALL @STEVE PIPE 01/01/20111 (04/26/2011)Details CEM-3701 Report
2278Project ID: 2278
DEA: 043S4304
04-MRN-1-9.0REPAIR SHOULDER 05/05/20111 (05/05/2011)Details CEM-3701 Report
2279Project ID: 2279
DEA: 043S4404
04-SOL-505-0.2SLIPOUT 06/08/20201 (08/15/2006)Details CEM-3701 Report
2280Project ID: 2280
DEA: 043S4504
EFIS: 0400000995
04-CC-680-23.0SIDESLOPE DAMAGE AND SLIDE 04/14/20211 (08/17/2006)Details CEM-3701 Report
2281Project ID: 2281
DEA: 043S4704
EFIS: 0400000996
04-SON-1-29.8SIDESLOPE DAMAGE AND SLIPOUT; CONSTRUCT SOIL NAIL WALL 06/08/20201 (10/29/2007)Details CEM-3701 Report
2282Project ID: 2282
DEA: 043S4804
04-NAP-128-12.57REPAIR LANE AND SLIPOUT 06/08/20111 (04/29/2011)Details CEM-3701 Report
2289Project ID: 2289
DEA: 043S5904
04-MRN-101,131-23.6,4.0REPAIR SLIPOUT AND IMPROVE DRAINAGE 04/20/20111 (04/20/2011)Details CEM-3701 Report
2292Project ID: 2292
DEA: 043S6124
04-NAP-128-14.6Construct Three Drainage Systems. 04/20/20111 (04/20/2011)Details CEM-3701 Report
2294Project ID: 2294
DEA: 043S6304
04-SM-84-18.5CONSTRUCT TIE BACK WALL AND SECANT WALL 05/05/20111 (05/05/2011)Details CEM-3701 Report