Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12991-13000 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1666 | Project ID: 1666 DEA: 040E4304 | 04-SCL-101-17.8 | CRACK SEALING | IN SANTA CLARA COUNTY IN SANTACLARA, SAN JOSE AND MORGAN HILL FROM COCHRANS ROAD OVERCROSSING TOSCHELLER AVENUE UNDERCROSSING | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
| 5553 | Project ID: 5553 DEA: 100E9404 | 10-MER-33-17.1/26.5 | CRACK SEAL, OVERLAY AND REPLACE AC SURFACING | MERCED COUNTY NEAR SANTA NELLA FROM 0.1 MILE SOUTH OF PLAZA ROAD TO ROUTE 140 | 12/27/2012 | 1 (11/08/2010) | Details CEM-3701 Report |
| 2391 | Project ID: 2391 DEA: 044C1524 | 04-SOL-80-20.1/30.6 | CRACK SEAL AND OVERLAY ON THE MAINLINE WITH SHOULDER BACKING | 02/05/2012 | 1 (01/25/2008) | Details CEM-3701 Report | |
| 1123 | Project ID: 1123 DEA: 033E0404 | 03-PLA-80-33.3/44.8 | CRACK AND SEAT PAVEMENT AND PLACE HOT MIX ASPHALT | Placer County in and near Colfax from Route 174/80 Separation to Alta Road Undercrossing. | 01/20/2010 | 1 (01/20/2010) | Details CEM-3701 Report |
| 2057 | Project ID: 2057 DEA: 04253784 | 04-SCL,ALA-680-M11.9/M15.9,M0.0/M5.4 | CRACK AND SEAL PCC PVMT, WIDEN BRIDGES | In Santa Clara and Alameda Counties from 0.4 KM South of Route 237/680 separation to Grimmer Blvd undercrossing | 05/11/2011 | 1 (05/11/2011) | Details CEM-3701 Report |
| 2561 | Project ID: 2561 DEA: 050G0304 EFIS: 0500000054 | 05-SLO-101-35.6/46.3 | Crack & Seat, Replace Pcc, Place Hma On Hwy & Ramps And Widen Bridges | 08/13/2018 | 1 (10/01/2012) | Details CEM-3701 Report | |
| 1301 | Project ID: 1301 DEA: 034E4104 | 03-ED-50-67.8/68.6 | COVER CUT SLOPES WITH CABLE MESH DRAPERY SYSTEM | 10/25/2010 | 1 (08/20/2009) | Details CEM-3701 Report | |
| 212187 | Project ID: 212187 DEA: 010F8904 EFIS: 0116000089 | 01-MEN-162-25.7/29.8 | COVELO REPLACE AC AND BWC OVERLAY | MENDOCINO COUNTY AT COVELO FROM 2.6 MILES WEST OF GRIST CREEK BRIDGE TO 0.5 MILE WEST OF MILL CREEK BRIDGE | 10/01/2018 | 1 (07/06/2017) | Details CEM-3701 Report |
| 993561 | Project ID: 993561 DEA: 080L1904 EFIS: 0800000398 | 08-RIV-74-M7.37/R8.27 | County of Riverside Transportation Department (RCTD) is constructing the final phase of the Clinton Keith Road Extension Project between Leon Road and SR 79 to provide an east-west urban arterial between Interstate 215 and SR 79. | 2 (02/10/2022) | Details CEM-3701 Report | ||
| 993141 | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 | 06-MAD-99-R6.9/R7.6 | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING | 12/02/2025 | 1 (07/28/2021) | Details CEM-3701 Report |
