Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12991-13000 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2224 | Project ID: 2224 DEA: 043A0704 | 04-SCl-9-0.0/7.1 | INSTALL CENTERLINE RUMBLE STRIP | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2226 | Project ID: 2226 DEA: 043A1104 | 04-SM-101-3.05 | INSTALL STANDBY GENERATOR | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2227 | Project ID: 2227 DEA: 043A1204 | 04-MRN-580-2.6 | REBUILD DAMAGED BRIDGE FENDER SYSTEM | 06/13/2011 | 1 (04/05/2011) | Details CEM-3701 Report | |
| 2231 | Project ID: 2231 DEA: 043A4304 EFIS: 0400000941 | 04-SOL-780-4.96 | ROSE DRIVE PEDESTRIAN OVERCROSSING | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 2233 | Project ID: 2233 DEA: 043A4704 | 04-CC-680-R21.2 | EXTEND HIGHWAY IN WALNUT CREEK AT 0.1 KM SOUTH IOF LILAC DRIVE UNDERCROSSING. | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2234 | Project ID: 2234 DEA: 043A4904 EFIS: 0400000944 | 04-SCL-880-2.0 | 03/18/2025 | 1 (08/10/2006) | Details CEM-3701 Report | ||
| 2238 | Project ID: 2238 DEA: 043A5604 | 04-SCL-152-21.3/22.0 | INSTALL CENTERLINE RUMBLE STRIP | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2239 | Project ID: 2239 DEA: 043A5904 | 04-ALA-13-R14.8 | CONSTRUCT CONCRETE BARRIER AND RAMP WIDENING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2242 | Project ID: 2242 DEA: 043A6604 EFIS: 0400000955 | 04-SOL-780-7.07 | REPAIR BRIDGE GIRDRS DAMAGE TO BR NO 23-0119 | 05/07/2019 | 1 (09/22/2006) | Details CEM-3701 Report | |
| 2243 | Project ID: 2243 DEA: 043A6714 | 04-CC,SOL-160,80-.26/0.0 | BATA 0001 - CARQUINEZ .ANTIOCH TOLL PLAZA | 08/19/2019 | NOT VERIFIED | Details CEM-3701 Report |
