Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12981-12990 of 19138 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213878Project ID: 213878
DEA: 060X9104
EFIS: 0618000181
06-FRE-99-6.5/11.1REPLACE CONCRETE PANEL WITH HMA (TYPE A) AND GRIND CONCRETE PAVEMENT.FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM FLORAL AVENUE UNDERCROSSING TO MERCED STREET UNDERCROSSING09/04/20191 (04/11/2019)Details CEM-3701 Report
213879Project ID: 213879
DEA: 081F7704
EFIS: 0815000051
08-SBD-247-20.3/76.8CONSTRUCT GROUND IN SHOULDER AND CENTERLINE RUMBLE STRIPSSAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF BOONE ROAD TO 0.7 MILE SOUTH OF RIMROCK ROAD06/23/20211 (06/23/2021)Details CEM-3701 Report
213880Project ID: 213880
DEA: 120L7224
EFIS: 1214000104
12-ORA-74-2.9/5.1,8.0MITIGATION PLANT ESTABLISHMENTORANGE COUNTY NEAR SAN JUAN CAPISTRANO FROM 0.3 MILE EAST OF ANTONIO PARKWAY/LA PATA AVENUE TO 0.2 MILE WEST OF CONROCK PLANT ENTRANCE AND IN CASPERS WILDERNESS PARK05/23/20231 (05/31/2019)Details CEM-3701 Report
213882Project ID: 213882
DEA: 101E8604
EFIS: 1015000124
10---   1 (03/30/2020)Details CEM-3701 Report
213883Project ID: 213883
Permit Numbers: 11156UT0360 11166RW0101
11-SD-8-0.8/0.9enter upon State Highway right of way in San Diego County, City of San Diego, on Route 8, postmiles 0.77-0.87 and 2.24, to trench and install approximately 770 feet of 12-inch natural gas pipeline, as shown on the attached plans, in accordance with the requirements and conditions contained herein aINTERSTATE 8, SAN DIEGO08/18/20211 (08/18/2021)Details CEM-3701 Report
213884Project ID: 213884
DEA: 051F1004
EFIS: 0513000057
Permit Numbers: 0519NOP0704 0520NDP0091
05---82.18/-1Re-align on and off-ramps at NB interchange. Signalize the intersection, revise pavement delineation and markings on Clark Avenue, minor pavement rehabilitation, guardrail replacement and widening at southbound off-ramp.Construct interchange improvements at US Highway 101 and Clark Avenue accordinUS Highway 101, Orcutt unincorporated08/17/20221 (02/18/2020)Details CEM-3701 Report
213894Project ID: 213894
DEA: 081H5304
EFIS: 0817000074
08-RIV,SBD-10,15,60,91,210,215-VarREPAIR DETECTION SITESRIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS08/09/20211 (10/22/2019)Details CEM-3701 Report
213895Project ID: 213895
DEA: 09375804
09-INY,MNO-6,168,395-VariousCOLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT.INYO AND MONO COUNTIES AT VARIOUS LOCATIONS01/06/2020NOT VERIFIEDDetails CEM-3701 Report
213896Project ID: 213896
DEA: 101H6304
10-SJ-5,205-varTREAT BRIDGE DECK AND REPLACE JOINT SEALS, REPLACE APPROACH SLABS.SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS01/24/20201 (04/11/2019)Details CEM-3701 Report
213897Project ID: 213897
DEA: 101H7104
EFIS: 1018000141
10-SJ-5-25.3/28.3CONSTRUCT CONCRETE BARRIER TRANSITIONS.SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM CHARTERWAY UNDERCROSSING TO SMITH CANAL BRIDGE08/31/20201 (04/11/2019)Details CEM-3701 Report