Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12951-12960 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213873 | Project ID: 213873 DEA: 034F2504 EFIS: 0314000086 | 03-PLA-80-R25.9/28.5 | PLACE CURED-IN-PLACE PIPELINERS AND REPLACE CULVERTS. | PLACER COUNTY NEAR COLFAX AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CROTHER ROAD OVERCROSSING TO 0.1 MILE WEST OF WEIMAR OVERCROSSING | 12/04/2019 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213870 | Project ID: 213870 Permit Numbers: 07156SN2163 07186RT3128 0719NRD1213 07206RT0479 07216RT0606 07216RW1701 07216RT2977 | 07---24.88 | * Resubmittal due 7/1Install traffic signal EB 210 at Walnut Street. | Route 210 (Foothill Freeway), Pasadena | 10/06/2022 | 1 (10/27/2020) | Details CEM-3701 Report |
| 213871 | Project ID: 213871 DEA: 060U5304 EFIS: 0615000283 MINOR: 06A2286 | 06-TUL-65-29.5 | HERMOSA LT PHASE- Add protected left turn phasing, signal heads and replace existing loop detectors | Eastbound and westbound lanes | 08/31/2023 | 1 (04/10/2019) | Details CEM-3701 Report |
| 213905 | Project ID: 213905 Permit Numbers: 11166MC0881 11196RT0592 | 11---4 | enter upon the State Highway right of way in San Diego County, City of San Diego, on Route 5, post mile 4.04, to modify raised median, restripe and upgrade signal, as shown on the attached plans, in accordance with the requirements and conditions contained herein and as further directed or approved | INTERSTATE 5, SAN DIEGO | 08/24/2021 | 1 (07/15/2019) | Details CEM-3701 Report |
| 213872 | Project ID: 213872 DEA: 010H9504 EFIS: 0118000134 | 01-DN,HUM-199,299-VAR | REPLACE THERMOPLASTIC TRAFFIC STRIPE AND MARKER DELINEATION. | DEL NORTE AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS | 08/23/2019 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213875 | Project ID: 213875 DEA: 040P4504 EFIS: 0417000438 | 04-ALA-24,980- | 03/12/2020 | 1 (06/04/2019) | Details CEM-3701 Report | ||
| 213876 | Project ID: 213876 DEA: 060X7304 EFIS: 0618000125 | 06-FRE-33-26.6/R28.7,41.4/52.4 | REPLACE AND REPAIR EXISTING DRAINAGE SYSTEMS. | FRESNO COUNTY AT VARIOUS LOCATIONS FROM 2.3 MILES NORTH OF JUNCTION ROUTE 198 TO 1.7 MILES NORTH OF DERRICK AVENUE AND FROM 1.1 MILES NORTH OF HARLAN AVENUE TO 1.0 MILE NORTH OF MANNING AVENUE. | 09/04/2019 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213877 | Project ID: 213877 DEA: 060X8904 EFIS: 0618000179 | 06-KIN-41-0.0/11.5 | COLD PLANE AC PAVEMENT AND PLACE RHMA TYPE G. | KINGS COUNTY ABOUT 6.5 MILES SOUTH OF KETTLEMAN CITY FROM KERN COUNTY LINE TO 0.1 MILE SOUTH OF UTICA AVENUE | 04/16/2021 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213878 | Project ID: 213878 DEA: 060X9104 EFIS: 0618000181 | 06-FRE-99-6.5/11.1 | REPLACE CONCRETE PANEL WITH HMA (TYPE A) AND GRIND CONCRETE PAVEMENT. | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM FLORAL AVENUE UNDERCROSSING TO MERCED STREET UNDERCROSSING | 09/04/2019 | 1 (04/11/2019) | Details CEM-3701 Report |
| 213879 | Project ID: 213879 DEA: 081F7704 EFIS: 0815000051 | 08-SBD-247-20.3/76.8 | CONSTRUCT GROUND IN SHOULDER AND CENTERLINE RUMBLE STRIPS | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF BOONE ROAD TO 0.7 MILE SOUTH OF RIMROCK ROAD | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
