Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12941-12950 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4925 | Project ID: 4925 DEA: 080H4004 | 08-SBD-38-14.8 | REMOVE DEAD AND DYING TREES | IN SAN BERNARDINO COUNTY ON STATE ROUTE 38FROM POST MILE 14.8 TO 59.4 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 213602 | Project ID: 213602 DEA: 060U9504 | 06-FRE,MAD,MPA,TUL-41,49,168,180,190-Var | REMOVE DEAD TREES. | FRESNO, MADERA, MARIPOSA, AND TULARE COUNTIES AT VARIOUS LOCATIONS | 12/04/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
| 7601 | Project ID: 7601 DEA: 024F6404 EFIS: 0212000172 | 02-SIS-96-27.7 | REMOVE DEBRIS | ABOUT 13 MILES WEST OF HAPPY CAMP AT 0.8 MILE WEST OF INDEPENDENCE | 11/07/2012 | 1 (09/10/2012) | Details CEM-3701 Report |
| 2855 | Project ID: 2855 DEA: 050R9304 | 05-MON-101-31.0/51.2 | REMOVE DEBRIS , REMOVE RACK CONSTRUCTION AND ROCKFALL DRAPERY | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 5021 | Project ID: 5021 DEA: 080K9004 | 08-SBd-38-15.3/15.8 | REMOVE DEBRIS AND REPAIR DEBRIS RACK | 1 (09/25/2007) | Details CEM-3701 Report | ||
| 5025 | Project ID: 5025 DEA: 080L0704 | 08-SBd-215-10/17 | REMOVE DEBRIS AND REPLACE DAMAGED MBGR AND SIGNS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5026 | Project ID: 5026 DEA: 080L0804 | 08-SBd-18,330-28/32,35/44 | REMOVE DEBRIS AND REPLACE DAMAGED MBGR AND SIGNS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 995322 | Project ID: 995322 DEA: 101R2904 EFIS: 1023000126 | 10-CAL-26-4.9/9.550000000000001 | Remove debris and restore all assets to their original condition, replace existing culvert pipes and structural section | 1 (11/16/2023) | Details CEM-3701 Report | ||
| 995428 | Project ID: 995428 DEA: 061G0704 EFIS: 0623000233 | 06-TUL-99-21.43/25.01 | Remove debris around piles | 02/26/2024 | 1 (11/13/2023) | Details CEM-3701 Report | |
| 995321 | Project ID: 995321 DEA: 101R2504 EFIS: 1023000122 | 10-MPA-140-35/35 | Remove debris by methods of scaling as recommended by Office of Geotechnical North, reestablish the toe of slope and drainage ditch, repair the structual slope if necessary | 1 (11/16/2023) | Details CEM-3701 Report |
