Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12861-12870 of 18759 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995519 | Project ID: 995519 DEA: 030L0804 EFIS: 0324000025 | 03-SAC-51-5.5/5.5 | Bridge Rail Replacement due to Vehicle Strike | Marconi Bridge | 03/21/2025 | 1 (01/17/2024) | Details CEM-3701 Report |
| 212802 | Project ID: 212802 DEA: 044H8704 EFIS: 0413000295 | 04-MRN,NAP-1,29-Var | CONSTRUCT CENTERLINE RUMBLE STRIP, WIDEN AC SHOULDERS. | MARIN AND NAPA COUNTIES AT VARIOUS LOCATIONS | 06/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 1701 | Project ID: 1701 DEA: 040E9804 EFIS: 0400000235 | 04-MRN,SON-VAR-VAR | Treat bridge decks with methacrylate and replace joint seals. | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 01/17/2014 | 1 (04/05/2011) | Details CEM-3701 Report |
| 214404 | Project ID: 214404 DEA: 040J6804 EFIS: 0414000025 | 04-MRN,SON-12,101,116-Var | PAVE GORES AND ROADSIDE AREAS, CONSTRUCT MAINTENANCE VEHICLE PULLOUTS. | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 04/02/2021 | 1 (10/07/2019) | Details CEM-3701 Report |
| 993602 | Project ID: 993602 DEA: 042K2404 EFIS: 0416000394 | 04-SON,SON-101-16.5-19 | REMOVE EXISTING AND CONSTRUCT NEW CONCRETE BRIDGE RAILING. | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 07/24/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
| 213136 | Project ID: 213136 DEA: 040Q5204 EFIS: 0418000111 | 04-MRN,SON-101-0.0/26.8,0.2/R56.2 | REPLACE PAVEMENT DELINEATION. | MARIN AND SONOMA COUNTIES FROM 0.5 MILE NORTH OF THE BEGINNING OF MARIN COUNTY LINE TO END OF SONOMA COUNTY LINE | 12/17/2019 | 1 (06/05/2018) | Details CEM-3701 Report |
| 213002 | Project ID: 213002 DEA: 042640N4 EFIS: 0412000649 | 04-MRN,SON-101-MRN27.0/27.6SON0.0/4.5 | CONSTRUCT HOV LANES | MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING | 03/12/2021 | 1 (04/13/2018) | Details CEM-3701 Report |
| 211777 | Project ID: 211777 DEA: 04209504 EFIS: 0412000116 | 04-MRN,SON-1-50.2/50.5,0.0/0.2 | REPLACE ESTERO BRIDGE AND REALIGN APPROACHING ROADWAY; Bridge No. 27-0121 | MARIN AND SONOMA COUNTIES NEAR VALLEY FORD FROM 0.4 MILE SOUTH OF ESTERO AMERICANO BRIDGE TO 0.2 MILE NORTH OF ESTERO AMERICANO BRIDGE | 10/21/2019 | 1 (01/17/2017) | Details CEM-3701 Report |
| 7670 | Project ID: 7670 MINOR: 04A3859 | 04-MRN-101,37,121,12-Various | FABRICATE AND INSTALL THIRTY-FIVE MISSION BELL MARKERS IN MARIN AND SONOMA COUNTIES ON ROUTES 101, 37, 121, AND 12 AT VARIOUS LOCATIONS. | MARIN AND SONOMA COUNTIES ON ROUTES 101, 37, 121, AND 12 AT VARIOUS LOCATIONS. | 02/20/2025 | 1 (08/31/2012) | Details CEM-3701 Report |
| 2426 | Project ID: 2426 DEA: 044S2504 | 04-MRN-108-5.1/7.1 | REPLACE AC SURFACING,COLD PLANE AC PAVEMENT AND PLACE HMA | Marin Co. near Stinson beach on county road A 108 from 2.0 miles north of Muir Woods Road to 2.0 miles south of route 1. | 04/18/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
