Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12831-12840 of 18759 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215022 | Project ID: 215022 DEA: 060U1704 EFIS: 0616000206 | 06-MAD-99-9.7 | BRIDGE DECK RESURFACE. | MADERA COUNTY IN MADERA AT SOUTH GATEWAY DRIVE OVERCROSSING BRIDGE | 04/16/2021 | 1 (06/17/2020) | Details CEM-3701 Report |
| 215606 | Project ID: 215606 DEA: 061C0014 EFIS: 0620000167 | 06-MAD-145-8.6 | PARKING LOT RESURFACING WITH COLD PLANE AND HOT MIX ASPHALT. | MADERA COUNTY IN MADERA AT THE MADERA MAINTENANCE STATION AT 125 WEST ALMOND AVENUE | 03/02/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
| 215192 | Project ID: 215192 DEA: 060W3604 EFIS: 0617000164 | 06-MAD-145-8.1/9.6 | CONSTRUCT CURB RAMPS AND MODIFY TRAFFIC SIGNAL ELEMENTS. | MADERA COUNTY IN MADERA AT VARIOUS LOCATIONS FROM AVENUE 13 TO 6TH STREET | 10/24/2022 | 1 (09/28/2020) | Details CEM-3701 Report |
| 214563 | Project ID: 214563 DEA: 060U6704 EFIS: 0616000120 | 06-MAD-145-9.7/11.0 | CONSTRUCT ADA CURB RAMPS. | MADERA COUNTY IN MADERA AT VARIOUS LOCATIONS FROM GATEWAY DRIVE TO TOZER STREET | 07/15/2021 | 1 (01/31/2020) | Details CEM-3701 Report |
| 209486 | Project ID: 209486 DEA: 060E6804 EFIS: 0612000085 | 06-MAD-99-R1.0-28.2 | PAINT BRIDGES. | MADERA COUNTY IN MADERA,CHOWCHILA AND AT FAIRMEAD AT VARIOUS LOCATIONS FROM AVENUE 7 OVERCROSSING TO LE GRAND AVENUE OVERCROSSING. | 02/23/2016 | 1 (12/26/2014) | Details CEM-3701 Report |
| 214692 | Project ID: 214692 DEA: 060Y4504 EFIS: 0618000222 | 06-MAD-152-R0.0/15.6 | PAVEMENT STRIPING AND MODIFY TRAFFIC MONITORING STATIONS. | MADERA COUNTY NEAR CHOWCHILLA FROM ROUTE 152/59 SEPARATION TO 0.1 MILE EAST OF ROUTE 152/99 SEPARATION | 04/16/2021 | 1 (02/11/2020) | Details CEM-3701 Report |
| 215455 | Project ID: 215455 DEA: 061A9204 EFIS: 0620000136 | 06-MAD-152-R0.0/15.5 | REMOVE CONCRETE PAVEMENT AND PLACE HMA. | MADERA COUNTY NEAR CHOWCHILLA FROM ROUTE 59/152 SEPARATION TO 0.1 MILE WEST OF ROUTE 99/152 SEPARATION. | 11/22/2021 | 1 (02/01/2021) | Details CEM-3701 Report |
| 209912 | Project ID: 209912 DEA: 060P9704 EFIS: 0612000319 | 06-MAD-152-R0.0/1.1 | CONSTRUCT HIGH TENSION CABLE BARRIER AND RUMBLE STRIP | MADERA COUNTY NEAR CHOWCHILLA FROM THE MERCED COUNTY LINE TO 0.1 MILE WEST OF ROAD 4 | 03/15/2021 | 1 (12/29/2014) | Details CEM-3701 Report |
| 993907 | Project ID: 993907 DEA: 061E2004 EFIS: 0621000225 | 06-MAD-99,152-24.8,7.3 | REPAIR BRIDGE DECK AND PLACE POLYESTER CONCRETE OVERLAY. | MADERA COUNTY NEAR CHOWCHILLA ON ROUTE 99 AT BERENDA SLOUGH BRIDGE AND ON ROUTE 152 AT ASH SLOUGH BRIDGE | 04/22/2024 | 1 (07/06/2022) | Details CEM-3701 Report |
| 211464 | Project ID: 211464 DEA: 060T5004 EFIS: 0615000072 | 06-MAD-41-5.2/34.7 | CENTERLINE RUMBLE STRIP,TRAFFIC STRIPES AND FLASHING BEACONS. | MADERA COUNTY NEAR COARSEGOLD AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF AVENUE 14 TO 0.8 MILE SOUTH OF ROUTE 49 | 07/31/2017 | 1 (09/08/2016) | Details CEM-3701 Report |
