Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12791-12800 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213973 | Project ID: 213973 DEA: 040J6604 EFIS: 0414000023 | 04-SCL-680-M0.0/M9.9 | ROADWAY EXCAVATION AND MINOR CONCRETE PAVING. | SANTA CLARA COUNTY AT VARIOUS LOCATIONS | 07/23/2020 | 1 (06/04/2019) | Details CEM-3701 Report |
| 213974 | Project ID: 213974 DEA: 040P4404 EFIS: 0417000437 | 04-CC-580-6.0 | CLEAN AND PAINT STRUCTURAL STEEL. | CONTRA COSTA COUNTY IN RICHMOND AT STENMARK DRIVE ON-RAMP UNDERCROSSING | 04/14/2020 | 1 (05/29/2019) | Details CEM-3701 Report |
| 213975 | Project ID: 213975 DEA: 040Q9804 | 04-SCL-101-R7.5/R17.8 | INDIVIDUAL SLAB REPLACEMENT (RSC). | SANTA CLARA COUNTY IN GILROY AND MORGAN HILL FROM LEAVESLEY ROAD TO COCHRANE ROAD OVERCROSSING | 11/21/2019 | 1 (06/04/2019) | Details CEM-3701 Report |
| 213976 | Project ID: 213976 DEA: 073W8804 EFIS: 0717000127 | 07-LA-1-56.9/62.9 | APPLY SLURRY SEAL AND REPLACE AC SURFACING. | LOS ANGELES COUNTY IN LOS ANGELES FROM TRANCAS CANYON ROAD/BROAD BEACH ROAD TO THE VENTURA COUNTY LINE | 11/02/2020 | 1 (11/02/2020) | Details CEM-3701 Report |
| 213977 | Project ID: 213977 DEA: 081J1404 EFIS: 0817000214 | 08--,40&58- | 09/02/2020 | 1 (06/07/2019) | Details CEM-3701 Report | ||
| 213978 | Project ID: 213978 DEA: 09376404 EFIS: 0918000062 | 09-MNO-395-R12.6/R25.8 | PLACE SHOULDER BACKING,COLD PLANE AC AND PLACE HMA | MONO COUNTY NEAR CROWLEY LAKE FROM 1.3 MILES SOUTH OF CROWLEY LAKE DRIVE OVERCROSSING TO ROUTE 395/203 SEPARATION | 11/12/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 213979 | Project ID: 213979 DEA: 09376504 EFIS: 0918000081 | 09-KER-58-77.3/R88.5 | REMOVE CONCRETE PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. | KERN COUNTY NEAR TEHACHAPI FROM 0.2 MILE EAST OF BEALVILLE ROAD TO 0.1 MILE WEST OF TEHACHAPI CREEK BRIDGE | 09/04/2019 | 1 (05/29/2019) | Details CEM-3701 Report |
| 213980 | Project ID: 213980 Permit Numbers: 0819NDP0049 0817NMC0867 0818NRW1334 0819NRT0062 0819NRT0970 0819NRT0971 | 08---43.648 | Enter Interstate 15 (I-15) right of way at the intersection of the NB off-ramp with eastbound Second Street in the City of Norco to perform grading and construct sidewalk, curb ramps, curb & gutter, cross-gutter, storm drain, gutter depression, grated drainage inlets, pavement, signal modifica | 2nd street, Norco | 06/23/2021 | 1 (02/08/2019) | Details CEM-3701 Report |
| 213981 | Project ID: 213981 DEA: 040P8204 EFIS: 0417000546 MINOR: 04A5472 | 04-SCL-237-R0.6 | UPGRADE & REPLACE PUMPS & ELEC. CONTROLS AT PUMP PLANT | 02/12/2025 | 1 (05/02/2019) | Details CEM-3701 Report | |
| 213982 | Project ID: 213982 Permit Numbers: 04166UT0590 04176RT1690 | 04--152-6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 1 (08/28/2019) | Details CEM-3701 Report |
