Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12701-12710 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213881 | Project ID: 213881 DEA: 044J3304 EFIS: 0415000324 | 04-SCL-280- | SCL-280- Lawrence Off-Ramp_Apple Project | SCL-280- Lawrence Off-Ramp_Apple Project | 07/17/2019 | 2 (01/16/2019) | Details CEM-3701 Report |
| 213882 | Project ID: 213882 DEA: 101E8604 EFIS: 1015000124 | 10--- | 1 (03/30/2020) | Details CEM-3701 Report | |||
| 213883 | Project ID: 213883 Permit Numbers: 11156UT0360 11166RW0101 | 11-SD-8-0.8/0.9 | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 8, postmiles 0.77-0.87 and 2.24, to trench and install approximately 770 feet of 12-inch natural gas pipeline, as shown on the attached plans, in accordance with the requirements and conditions contained herein a | INTERSTATE 8, SAN DIEGO | 08/18/2021 | 1 (08/18/2021) | Details CEM-3701 Report |
| 213884 | Project ID: 213884 DEA: 051F1004 EFIS: 0513000057 Permit Numbers: 0519NOP0704 0520NDP0091 | 05---82.18/-1 | Re-align on and off-ramps at NB interchange. Signalize the intersection, revise pavement delineation and markings on Clark Avenue, minor pavement rehabilitation, guardrail replacement and widening at southbound off-ramp.Construct interchange improvements at US Highway 101 and Clark Avenue accordin | US Highway 101, Orcutt unincorporated | 08/17/2022 | 1 (02/18/2020) | Details CEM-3701 Report |
| 213885 | Project ID: 213885 DEA: 042J8000 EFIS: 0415000034 | 04--- | 02/12/2025 | 1 (09/16/2019) | Details CEM-3701 Report | ||
| 213886 | Project ID: 213886 DEA: 022H1804 EFIS: 0216000063 | 02-SIS-161-18.3/19.4 | FULL DEPTH RECLAMATION - CEMENT WITH HMA (TYPE A) | SISKIYOU COUNTY NEAR TULELAKE FROM 1.0 MILE EAST OF HILL ROAD TO ROUTE 139 | 08/06/2019 | 1 (04/03/2019) | Details CEM-3701 Report |
| 213887 | Project ID: 213887 DEA: 024H2604 EFIS: 0218000100 | 02-SIS-97-R11.5/17.1 | COLD PLANE AC, REPLACE AC SURFACING, PLACE AC, RUMBLE STRIP & STRIPE. | SISKIYOU COUNTY ABOUT 12 MILES NORTH OF WEED FROM YELLOW BUTTE ROAD TO 0.6 MILE NORTH OF DEER MOUNTAIN ROAD | 01/04/2021 | 1 (04/03/2019) | Details CEM-3701 Report |
| 213888 | Project ID: 213888 DEA: 024H2704 EFIS: 0218000101 | 02-SHA-44-34.0/43.2 | PLACE HMA (TYPE A) OVERLAY. | SHASTA COUNTY AT AND NEAR VIOLA FROM 0.2 MILE EAST OF MILL CREEK ROAD TO 0.8 MILE EAST OF DEER FLAT ROAD | 12/04/2019 | 1 (04/03/2019) | Details CEM-3701 Report |
| 213889 | Project ID: 213889 DEA: 030H5104 EFIS: 0315000201 | 03-YUB-70-R11.0/13.6 | REMOVE THRIE-BEAM MEDIAN BARRIER & INSTALL CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 0.3 MILE SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 05/11/2020 | 1 (02/21/2019) | Details CEM-3701 Report |
| 213890 | Project ID: 213890 DEA: 031G4104 EFIS: 0318000170 | 03-NEV-20-0.0/25.8 | STRIPING | NEVADA COUNTY FROM THE YUBA COUNTY LINE TO PINE NEEDLE LANE | 09/06/2019 | 1 (02/21/2019) | Details CEM-3701 Report |
