Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12691-12700 of 18990 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993717 | Project ID: 993717 DEA: 021J8304 EFIS: 0220000148 | 02-SHA,TEH-5,36,44-VAR | REINF STRUCTURAL CONC BRIDGE, APPROACH SLAB & POLYESTER CONC OVERLAY. | SHASTA AND TEHAMA COUNTIES AT VARIOUS LOCATIONS | 05/06/2024 | 1 (04/11/2022) | Details CEM-3701 Report |
| 4138 | Project ID: 4138 DEA: 072X1704 | 07-LA-47-3.5/4.5 | REINFORCE BRIDGE RAILING POSTS WITH WELDED L - BRACKETS | 08/30/2010 | 1 (08/30/2010) | Details CEM-3701 Report | |
| 212661 | Project ID: 212661 DEA: 023H7504 | 02-PLU-70-27.4, 27.4 | Reinforce existing crib wall with steel pile and tie backs. Reconstruct roadway surface and MBGR | 07/27/2018 | 1 (01/03/2018) | Details CEM-3701 Report | |
| 214620 | Project ID: 214620 DEA: 07309304 EFIS: 0714000281 | 07-LA-210,405,605-Various | REINFORCE STRUCTURAL CONCRETE BRIDGE AND PLACE RHMA SHOULDER PAVING. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 07/26/2022 | 1 (04/15/2020) | Details CEM-3701 Report |
| 6450 | Project ID: 6450 DEA: 12085104 | 12-ORA-39,72-19.2/23.2,11.4/11.9 | REINFORCED CONCRETE CULVERT WIDENING WITH PRECAST CONCRETE BOX GIRDER AND PAVEMENT REHABILITATION | IN LA HABRA ON ROUTE 39 FROM HARBOR BOULEVARD TO IMPERIAL HIGHWAY AND ON ROUTE 72 FROM BEACH BOULEVARD TO VALLEY HOME AVENUE | 12/02/2011 | 1 (12/02/2011) | Details CEM-3701 Report |
| 4330 | Project ID: 4330 DEA: 074G5204 | 07-VEN-150- 8.7 | REINFORCED CONCRETE PIPES | IN VENTURA COUNTY NEAR RANCHO SANTA ANA AT 3.9 KM WEST OF SANTA ANA ROAD | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 3681 | Project ID: 3681 EFIS: 0000001155 Permit Numbers: 0709NMC2011 | 07-LA-210-39.36/39.79 | Reinstalling pavement delineations at the intersection of Route 210 (Foothill Freeway) westbound ramps at 1st Street due to lane assignment modifications on 1st Street, modifying State operated signals at the intersection of Azusa Avenue and 1st Street du | 210 Fwy, Azusa | 10/30/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 3735 | Project ID: 3735 EFIS: 0000001155 Permit Numbers: 07106DP1303 | 07-LA-210-39.36/39.79 | Reinstalling pavement delineations at the intersection of Route 210 (Foothill Freeway) westbound ramps at 1st Street due to lane assignment modifications on 1st Street, modifying State operated signals at the intersection of Azusa Avenue and 1st Street du | 210 Fwy, Azusa | 10/30/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 6941 | Project ID: 6941 DEA: 060M3104 EFIS: 0600000953 MINOR: 06A1674 | 06-KER-178-26.7/T30.1 | Reline and Repair Culvert | Kern County at Various Locations | 09/30/2020 | 2 (12/05/2014) | Details CEM-3701 Report |
| 3316 | Project ID: 3316 DEA: 060K9904 | 06-FRE-168-16.6/L29.6 | Reline culverts | FRESNO COUNTY NEAR PRATHER AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MENDOCINO AVENUE TO 2.5 MILES EAST OF PRATHER POND ROAD | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
