Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12601-12610 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6867 | Project ID: 6867 DEA: 120J5104 EFIS: 1200000278 Permit Numbers: 1211NMC0019 | 12-ORA-5-27.59/27.59 | construct improvements to Jamboree Road between Michelle Drive and El Camino Real in Irvine. The proposed improvements will include an additional travel lane in each direction. See attached permit application for the detailed description of work within the | Jamboree Road, Irvine | 12/31/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 6866 | Project ID: 6866 EFIS: 0000001155 Permit Numbers: 04116DP0693 | 04-SCL-101-0/17.82 | Minor Roadway widening | Cochrane Road / Route 101 interchange, Morgan Hill | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6865 | Project ID: 6865 DEA: 050R9904 EFIS: 0500000395 MINOR: 05A1454 | 05-SB--R8.9 | Hwy. 156 Highway Lighting | Near Hollister at Buena Vista Rd. | 05/23/2019 | 1 (01/30/2012) | Details CEM-3701 Report |
| 6864 | Project ID: 6864 DEA: 060M1904 EFIS: 0600000951 | 06-TUL-190-16.5 | Construct Concrete Barrier | At Main Street in Porterville, Tulare Co. CA | 09/14/2020 | 1 (10/10/2011) | Details CEM-3701 Report |
| 6863 | Project ID: 6863 DEA: 11367504 EFIS: 1100020427 MINOR: 11A1922 | 11-SD-52-7.2 | Install Joint Seal System | IN SAN DIEGO COUNTY IN SAN DIEGO ON EASTBOUND 52 TO NORTHBOUND 15 CONNECTOR RAMP | 2 (11/01/2010) | Details CEM-3701 Report | |
| 6862 | Project ID: 6862 DEA: 024E2204 EFIS: 0200020239 | 02-TEH-99-0.0/10.82 | CONSTRUCT GROUND IN RUMBLE STRIP ON HIGHWAY SHOULDERS AND CENTERLINE | 11/05/2020 | 2 (06/20/2014) | Details CEM-3701 Report | |
| 6861 | Project ID: 6861 DEA: 080P8004 EFIS: 0800020032 | 08-RIV-15-8.0/50.0 | REPLACE VARIOUS SLABS | RIVERSIDE COUNTY IN RIVERSIDE, CORONA AND MURRIETA FROM 0.3 MILE NORTH OF RAINBOW VALLEY BOULEVARD OVERCROSSING TO 0.7 MILE NORTH OF BELLEGRAVE AVENUE. | 11/08/2012 | 1 (03/09/2012) | Details CEM-3701 Report |
| 6860 | Project ID: 6860 DEA: 04448834 EFIS: 0400021235 | 04-SCL-152-6.1/6.5 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SANTA CLARA COUNTY IN GILROY FROM 0.3 MILE WEST OF UVAS CREEK BRIDGE TO 0.1 MILE EAST OF UVAS CREEK BRIDGE | 08/21/2018 | 1 (05/09/2012) | Details CEM-3701 Report |
| 6859 | Project ID: 6859 EFIS: 0000001155 Permit Numbers: 1209NMC0151 | 12-ORA-39-15.573/15.573 | Perform street improvements along Artesia Blvd including pavement rehabilitation at the Artesia Blvd/Knott Avenue intersection; pavement rehabilitation and modification to the east leg of the intersection at Artesia Blvd/Firestone Blvd/I-5 Northbound Ramp | ARTESIA BLVD, BUENA PARK | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
