Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12591-12600 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213472 | Project ID: 213472 DEA: 031H0604 EFIS: 0316000052 | 03-YOL-50-0.7 | Guardrail reconstruction Yolo 80/50 connector | 07/22/2021 | 1 (01/08/2019) | Details CEM-3701 Report | |
| 213473 | Project ID: 213473 Permit Numbers: 0717NMC0725 07176DP2028 0717NRW2377 07186RT0795 | 07--105-9.788/9.788 | Addition of a pedestrian crosswalk on south side of the intersection to accommodate the proposed pedestrian crosswalk. Signal modifications, activated push button installation, curb return, sidewalk and curb ramp modifications. Existing median will be adjusted to accommodate the proposed crosswal | Willowbrook Ave east, NA | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report |
| 213475 | Project ID: 213475 DEA: 010C7104 EFIS: 0113000031 | 01-HUM-101-77.0/77.5 | ROADWAY PAVING AND INSTALLATION OF SIGNAL, RETAINING WALL, SIDEWALK. | HUMBOLDT COUNTY IN EUREKA FROM 0.3 MILE SOUTH TO 0.2 MILE NORTH OF WABASH AVENUE | 04/12/2021 | 1 (08/24/2018) | Details CEM-3701 Report |
| 213476 | Project ID: 213476 DEA: 034F4604 EFIS: 0314000165 | 03-YOL,SAC-50-2.4/3.2,L0.0/R5.3 | INSTALL FIBER OPTICS SYSTEM | YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF JEFFERSON BOULEVARD UNDERCROSSING TO WATT AVENUE OVERCROSSING | 05/11/2020 | 1 (01/08/2019) | Details CEM-3701 Report |
| 213477 | Project ID: 213477 DEA: 080H4704 EFIS: 0812000074 | 08-SBD-2-2.44 | WIDEN BRIDGE TO ACCOMMODATE STANDARD SHOULDERS | AT WRIGHTWOOD AT SHEEP CREEK BRIDGE | 01/18/2022 | 1 (12/31/2018) | Details CEM-3701 Report |
| 213478 | Project ID: 213478 DEA: 101E5804 EFIS: 1016000104 | 10-MPA,MER,STA-140,165-Var | CONSTRUCT RUMBLE STRIP. | MARIPOSA, MERCED AND STANISLAUS COUNTIES AT VARIOUS LOCATIONS | 08/02/2019 | 1 (10/22/2018) | Details CEM-3701 Report |
| 213479 | Project ID: 213479 Permit Numbers: 0818NMC0232 0818NRT8047 08196DP0084 08196RW0211 0819NRW0054 0819NRW0189 0819NRW0422 0819NRT0771 08196RT0772 | 08---33.2 | Enter onto State Route 62 (SR-62) right-of-way at Adobe Road in the City of Twentynine Palms to install raised median, road widening, signing and striping modification, and traffic signal modification as per plans date stamped June 19, 2018 by Caltrans District 8 Encroachment Permits Office, and/or | 29Palms Hwy, 29Palms | 06/23/2021 | 1 (10/18/2018) | Details CEM-3701 Report |
| 213480 | Project ID: 213480 DEA: 010J1604 EFIS: 0118000177 | 01-MEN,MEN-101-37.4/40.0 | Storm Damage Repairs - Roadway Stabilization | 01/12/2022 | 1 (08/17/2018) | Details CEM-3701 Report | |
| 213481 | Project ID: 213481 DEA: 010J0804 EFIS: 0011800157 | 01-HUM,HUM-var,Var-var, Var | Construct hardened fencing, install landscaping/hardscaping, install drainage, repairs to highway facilities | 08/20/2020 | 1 (08/24/2018) | Details CEM-3701 Report | |
| 213482 | Project ID: 213482 DEA: 071XH104 EFIS: 0718000346 | 07-LA-105,105 1-R2.00/R2.29, R2.0 - R2.20 26.15 & 26.50 | Inspect the tunnels with a licensed C10 and C16 contractor to replace the failed fire detection system, screw rods, dampers track and motors. | 05/11/2022 | 1 (06/30/2021) | Details CEM-3701 Report |
