Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12581-12590 of 18861 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214620Project ID: 214620
DEA: 07309304
EFIS: 0714000281
07-LA-210,405,605-VariousREINFORCE STRUCTURAL CONCRETE BRIDGE AND PLACE RHMA SHOULDER PAVING.LOS ANGELES COUNTY AT VARIOUS LOCATIONS07/26/20221 (04/15/2020)Details CEM-3701 Report
6450Project ID: 6450
DEA: 12085104
12-ORA-39,72-19.2/23.2,11.4/11.9REINFORCED CONCRETE CULVERT WIDENING WITH PRECAST CONCRETE BOX GIRDER AND PAVEMENT REHABILITATIONIN LA HABRA ON ROUTE 39 FROM HARBOR BOULEVARD TO IMPERIAL HIGHWAY AND ON ROUTE 72 FROM BEACH BOULEVARD TO VALLEY HOME AVENUE12/02/20111 (12/02/2011)Details CEM-3701 Report
4330Project ID: 4330
DEA: 074G5204
07-VEN-150- 8.7REINFORCED CONCRETE PIPESIN VENTURA COUNTY NEAR RANCHO SANTA ANA AT 3.9 KM WEST OF SANTA ANA ROAD08/10/20101 (08/10/2010)Details CEM-3701 Report
3681Project ID: 3681
EFIS: 0000001155
Permit Numbers: 0709NMC2011
07-LA-210-39.36/39.79Reinstalling pavement delineations at the intersection of Route 210 (Foothill Freeway) westbound ramps at 1st Street due to lane assignment modifications on 1st Street, modifying State operated signals at the intersection of Azusa Avenue and 1st Street du210 Fwy, Azusa10/30/2012NOT VERIFIEDDetails CEM-3701 Report
3735Project ID: 3735
EFIS: 0000001155
Permit Numbers: 07106DP1303
07-LA-210-39.36/39.79Reinstalling pavement delineations at the intersection of Route 210 (Foothill Freeway) westbound ramps at 1st Street due to lane assignment modifications on 1st Street, modifying State operated signals at the intersection of Azusa Avenue and 1st Street du210 Fwy, Azusa10/30/2012NOT VERIFIEDDetails CEM-3701 Report
6941Project ID: 6941
DEA: 060M3104
EFIS: 0600000953
MINOR: 06A1674
06-KER-178-26.7/T30.1Reline and Repair CulvertKern County at Various Locations09/30/20202 (12/05/2014)Details CEM-3701 Report
3316Project ID: 3316
DEA: 060K9904
06-FRE-168-16.6/L29.6Reline culvertsFRESNO COUNTY NEAR PRATHER AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MENDOCINO AVENUE TO 2.5 MILES EAST OF PRATHER POND ROAD08/25/20111 (11/04/2011)Details CEM-3701 Report
214150Project ID: 214150
DEA: 080G8004
EFIS: 0812000111
08-SBD-38-47.50/59.40RELINE OR REPLACE CULVERTSSAN BERNARDINO COUNTY IN AND NEAR BIG BEAR LAKE AT VARIOUS LOCATIONS FROM ZACA ROAD TO BIG BEAR LAKE DAM11/01/20221 (05/09/2019)Details CEM-3701 Report
214438Project ID: 214438
DEA: 080G6914
EFIS: 0815000184
08---RELINE OR REPLACE CULVERTSSAN BERNARDINO COUNTY IN AND NEAR SAN BERNARDINO FROM 48TH STREET TO ROUTE 18/138 SEPARATION07/22/20251 (06/24/2021)Details CEM-3701 Report
209302Project ID: 209302
DEA: 11380104
EFIS: 1100000769
MINOR: 11A2163
11-SD-5-53.2Relocate a Metal Post with Flashing Beacon and Install Pedestrian Walk SignIn SD County in City of Oceanside, Mission Ave WB 1 (11/01/2010)Details CEM-3701 Report