Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12491-12500 of 18766 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213661Project ID: 213661
Permit Numbers: 04176SN1102 04186DP1813 0418NRW2706
04---1.78/1.78Install a new signal as part of a new building at the intersection of San Pablo Avenue and 67th Street. The work will include installation of a new controller cabinet, service cabinet, traffic signal poles and equipment, conduits, detector loops, emergency vehicle preemption equipment.San pablo Avenue, Oakland10/22/20191 (10/01/2018)Details CEM-3701 Report
213662Project ID: 213662
DEA: 034H7304
EFIS: 0319000037
03-YUB,YUB,NEV-49-7.43, 7.43/2.71Clear water diversion, grout the voids around the 90" CMP, invert pave using Nelson studs, incidental work, and repair slope damage. 05/05/20201 (01/08/2019)Details CEM-3701 Report
213663Project ID: 213663
DEA: 042Q8104
EFIS: 0419000051
04-SON-116-1.10Construct RSP and sheetpile wall 12/17/20191 (08/19/2019)Details CEM-3701 Report
213664Project ID: 213664
DEA: 042Q9804
EFIS: 0419000118
04-CC,CC,SOL-680-25.1/25.5, 0.0/0.9Repair expansion joint assembly 12/17/20191 (10/24/2018)Details CEM-3701 Report
213665Project ID: 213665
DEA: 071XJ504
EFIS: 0719000057
07-LA-60-11.0, 11.00Remove & reconstruct concrete barrier, repair spalls, remove & replace damaged bridge railing & repair electrical conduits. 10/06/20221 (06/30/2021)Details CEM-3701 Report
213666Project ID: 213666
DEA: 071XJ404
EFIS: 0719000060
07-LA-39-25.0/25.9Replace MBGR w/MGS, place vegetation control, replace signs, clean slopes & drainage systems & remove temporary railing.In Los Angeles County, on LA -39 at East Fork Road.06/25/2019NOT VERIFIEDDetails CEM-3701 Report
213667Project ID: 213667
Permit Numbers: 0415NSN1717 04176DP1145 0417NRT1013
04-SM-84-24.2/23.3At woodside (SR 84) Hudson,removal of existing ped push buttons and replacement with APS ped push buttons.SR 84 at Hudson ,SR 84 at Hess, Redwood City01/22/20201 (10/02/2018)Details CEM-3701 Report
213668Project ID: 213668
Permit Numbers: 0817NMC0360 08186DP0824 0818NRT0666 0819NRT0090 08186RW1158
08-SBD-10-22.09/22.16Enter onto Interstate 10 (I-10) right of way at Rancho Avenue, in the City of Colton, to do widening of I-10 eastbound on-ramp. The work includes construction of new asphalt concrete pavement, retaining wall, embankment, pedestrian barrier on retaining wall, striping, traffic signal modification,Interstate 10 Eastbound On-ramp, Colton06/23/20211 (11/30/2018)Details CEM-3701 Report
213669Project ID: 213669
DEA: 06324524
EFIS: 0617000065
MINOR: 06A2459
06-TUL-52.5-KINGS RIVER MITIGATION PLANT ESTABLISHMENTTulare County11/29/20221 (01/31/2020)Details CEM-3701 Report
213670Project ID: 213670
DEA: 042Q3804
EFIS: 0419000006
04-ALA-880-Repair expansion damIn Alameda County on Route 880 at San Leandro Creek Bridge, Br No. 30-0100, 04-ALA-880-PM24.203/18/20251 (10/04/2018)Details CEM-3701 Report