Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12481-12490 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7511 | Project ID: 7511 EFIS: 0000001155 Permit Numbers: 0812NMC0482 0813NDP0006 0814ART0189 0814ART0190 | 08-SBD-15-29.5/30.9 | Enter onto Interstate 15 (I-15) right of way at Ranchero Road in the City of Hesperia, San Bernardino County, to construct new I-15/Ranchero Road interchange including approx. 1300 foot auxiliary lane prior to N/B off ramp, and approx. 3200 foot auxiliary lane from S/B loop on ramp, street improvem | Ranchero Road, Hesperia | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7135 | Project ID: 7135 EFIS: 0000001155 Permit Numbers: 0811NMC1008 0812NDP0106 0812NRT1093 0812NRT1124 | 08-SBD-15-38.3/39.4 | Enter onto Interstate 15 (I-15) right of way at La Mesa Road and Nisqualli Road in the City of Victorville to construct new I-15 interchange as per plans and special provisions date stamped December 9, 2011 by Caltrans District 8 Encroachment Permits Office | La Mesa Road/Nisqualli Road, Victorville | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 214100 | Project ID: 214100 Permit Numbers: 08186CD0111 08166CD1029 | 08---37.819 | Enter onto Interstate 15 (I-15) right of way at Foothill Parkway/ El Cerrito Road Interchange in the City of Corona, to setup temporary traffic control and to perform the following: Construct new curb and gutter between Bedford Canyon Road and I-15 SB on-ramp for widening of Foothill Parkway, modif | El Cerrito Road / Foothill Pkwy, Corona | 06/23/2021 | 1 (06/14/2019) | Details CEM-3701 Report |
| 993415 | Project ID: 993415 Permit Numbers: 0821NMC0652 0822NRT0691 | 08---5.298 | Enter onto Interstate 15 (I-15) right of way at Foothill Blvd, in the City of Rancho Cucamonga, to do 2 inch grind and overlay pavement rehabilitation on Foothill Blvd, upgrade all existing ADA curb ramps at the I-15 NB and SB on/off ramps along Foothill Blvd, do restriping on Foothill Boulevard Co | I-15 at Foothill Blvd, Rancho Cucamonga | NOT VERIFIED | Details CEM-3701 Report | |
| 209254 | Project ID: 209254 Permit Numbers: 0813NMC1021 0814NLT0053 08146DP0054 0814NDP0124 0814NRT1129 0815NRT0007 | 08-RIV-10-11.1/11.6 | Enter onto Interstate 10 right-of-way at Sunset Avenue Interchange in City of Banning, to realign Sunset Avenue to accommodate railroad grade separation adjacent to the interchange, realign ramp profiles to accommodate Sunset Avenue profile, roadway improvement, retaining wall construction, drainag | Sunset Avenue, Banning | 07/31/2018 | 1 (11/21/2013) | Details CEM-3701 Report |
| 209008 | Project ID: 209008 DEA: 080F0504 EFIS: 0800000110 Permit Numbers: 0813NMC0535 | 08-RIV-10-44/45 | Enter onto Interstate 10 right-of-way at Monterey Avenue Interchange, in the Thousand Palms community of Riverside County, to construct new improvements including realigning the westbound off-ramps to Varner Road and add a new signal, construct a new loop | I-10 Monterey Ave IC, Thousand Palm/Palm Desert | 08/25/2021 | 1 (04/02/2014) | Details CEM-3701 Report |
| 7674 | Project ID: 7674 EFIS: 0000001155 Permit Numbers: 0812NRD0627 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street lighting | Monroe Street, Indio | 01/29/2013 | 2 (01/29/2013) | Details CEM-3701 Report |
| 5194 | Project ID: 5194 DEA: 080N7504 EFIS: 0800000541 Permit Numbers: 0811NMC0628 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street lighti | Monroe Street, Indio | 08/13/2012 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7454 | Project ID: 7454 EFIS: 0000001155 Permit Numbers: 08126DP0403 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street light | Monroe Street, Indio | 01/21/2013 | 2 (01/21/2013) | Details CEM-3701 Report |
| 5190 | Project ID: 5190 Permit Numbers: 0811NDP0453 | 08-RIV-10-39/39.9 | Enter onto Interstate 10 right-of-way at Date Palm Drive Interchange, in Cathedral City, for the reconstruction of the interchange including Bridge widening six-lanes overcrossing with sidewalks and bike lanes, a raised median, new signals, and new/realign | Date Palm Drive Interchange, Cathedral City | 07/31/2018 | 1 (01/30/2013) | Details CEM-3701 Report |
