Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12471-12480 of 18766 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213641Project ID: 213641
DEA: 024H9204
EFIS: 0219000025
02-SHA,SHA,SIS-5,5,89-25.8/67.02, 0.0/R9.0, 24.5/34.6Restore MBGR and end treatments, mulching and hydro-seed. Remove burned trees. Repair or replace other fire damage items. 08/25/20201 (01/08/2019)Details CEM-3701 Report
213642Project ID: 213642
Permit Numbers: 09176CD0130 09186DP0172 09186RW0275 09186RW0302 0919NRW0022 0919NRW0043 0919NRW0044 09196RT0047 0919NRW0099 0919NRW0138 0919NRD0181 09196RW0185 09196RW0186 09196RW0187
09---8.86/9.38Construct roadway improvements as shown on the attached 29 plan sheets (Titled: Tucker Road (Highway 202)).Notwithstanding General Provision # 4, your contractor is required to apply for and obtain an encroachment permit prior to starting work.A Pre-Construction meeting with the District 9 EncroachTehachapi Blvd and Valley Blvd, Tehachapi06/23/20211 (07/19/2019)Details CEM-3701 Report
213643Project ID: 213643
DEA: 010C4704
EFIS: 0112000287
01-DN-199-33.4UPGRADE WASTEWATER TREATMENT SYSTEMDEL NORTE COUNTY NEAR IDLEWILD AT COLLIER TUNNEL SAFETY ROADSIDE REST AREA11/30/20201 (09/25/2018)Details CEM-3701 Report
213644Project ID: 213644
DEA: 040J1404
04-SM-92-6.0INSTALL ROCK SLOPE PROTECTION AND UPGRADE DRAINAGE FACILITIES.CONSTRUCTION ON STATE HIGHWAY IN SAN MATEO COUNTY EAST OF ROUTE 35 CONSTRUCT ROCK SLOPE PROTECTION.10/21/20191 (10/21/2019)Details CEM-3701 Report
213645Project ID: 213645
DEA: 044J2814
04-SCL-82-10.3/14.4COLD PLANE EXIST. PAVEMENT, PLACE HMA & RHMA & MOD. ELECTRICAL SYSTEM.SANTA CLARA FROM PORTOLA AVENUE TO LAWRENCE EXPRESSWAY OC04/14/20251 (05/16/2019)Details CEM-3701 Report
213646Project ID: 213646
DEA: 060W4604
EFIS: 0617000225
06-KER-5-12.5CONSTRUCT STRUCTURE APPROACH AND PLACE POLYESTER CONCRETE OVERLAY.KERN COUNTY NEAR GRAPEVINE AT CALIFORNIA AQUEDUCT BRIDGE12/04/20191 (09/25/2018)Details CEM-3701 Report
213647Project ID: 213647
DEA: 080N9724
EFIS: 0815000102
08-SBD-395-35.5/39.1CONSTRUCT MEDIAN AND WIDENING SHOULDERSAN BERNARDINO COUNTY NEAR ADELANTO FROM 1.3 MILES SOUTH TO 2.3 MILES NORTH OF KRAMER ROAD12/02/20191 (03/05/2019)Details CEM-3701 Report
213648Project ID: 213648
DEA: 080R3104
EFIS: 0812000057
08-RIV-74-12.1/R14.3RECONSTRUCT SIDEWALKS, CURB RAMPS AND DRIVEWAYSRIVERSIDE COUNTY IN LAKE ELSINORE AT VARIOUS LOCATIONS FROM MACY STREET TO 0.1 MILE EAST OF LAKESHORE DRIVE.12/02/20191 (01/08/2019)Details CEM-3701 Report
213649Project ID: 213649
DEA: 081E8104
EFIS: 0814000107
08-SBD-215-14.1/14.9UPGRADE EXISTING WEIGH IN MOTION (WIM) SYSTEM.SAN BERNARDINO COUNTY IN SAN BERNARDINO FROM PALM AVENUE UNDERCROSSING TO LITTLE LEAGUE DRIVE OVERCROSSING07/10/20191 (01/09/2019)Details CEM-3701 Report
213650Project ID: 213650
DEA: 081E8504
EFIS: 0814000114
08-SBD-142-0.0/5.8COLD PLANE/OVERLAY, HMA DIKES, INSTALL MGS AND DRAINAGE FACILITIESSAN BERNARDINO COUNTY IN AND NEAR CHINO HILLS FROM ORANGE COUNTY LINE TO ROUTE 142/71 SEPARATION.08/28/20201 (04/16/2019)Details CEM-3701 Report