Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12471-12480 of 18992 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 794 | Project ID: 794 EFIS: 0000001155 Permit Numbers: 0309NSN0561 | 03-YOL-50-2.92/2.92 | reconstruction of Hwy 50 S river rd off-ramp for "bridge "district" Phase I public roadway/redevelopement project. existing grades at the street intersection will be raised and the number of travel lanes increased, requiring the reconstrcution of the off-ramp up to the bridge abutemen | 111 Tower Street, West Sacramento | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 7963 | Project ID: 7963 DEA: 10472104 EFIS: 1000000440 COOP: 100397 | 10-STA-99- | Reconstruction of interchange at SR 99 at Pelandale Ave. | City of Modesto, CA | 03/23/2020 | 2 (04/19/2013) | Details CEM-3701 Report |
| 215056 | Project ID: 215056 Permit Numbers: 0520NMC0221 | 05-SB-246-29.242/-1 | Reconstruction of southeast corner of Highway 246 and 5th Street intersection in Solvang, California. Work includes demolition and reconstruction of existing sidewalk, curb, gutter, construct modified Case C curb ramp, relocation of a power pole, relocation or replace traffic signal facilities, and | Highway 246 and Fifth Street , Solvang | 09/23/2022 | 1 (07/03/2020) | Details CEM-3701 Report |
| 210599 | Project ID: 210599 DEA: 043A2304 COOP: 042320A5 | 04-SON-101-25.9/26.3 | Reconstruction of the Airport Boulevard Interchange, and (b) implementation of improvements to the traffic operations | On US 101 between Airport Boulevard and Fulton Road, in Sonoma County | 08/19/2019 | 1 (08/19/2019) | Details CEM-3701 Report |
| 210580 | Project ID: 210580 DEA: 022E8004 EFIS: 0200000603 | 02-SIS-5-R7.2 | RECONSTRUCTION OF THE DUNSMUIR COMMERCIAL VEHICLE ENFORCEMENT FACILITY | IN SISKIYOU COUNTY NEAR DUNSMUIR ATDUNSMUIR GRADE COMMERCIAL VEHICLE ENFORCEMENT FACILITY. | 11/13/2020 | 1 (09/23/2015) | Details CEM-3701 Report |
| 993186 | Project ID: 993186 DEA: 04264704 EFIS: 0400000740 | 04-SCL-101-40.0/41.5 | Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchange | The Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County | 2 (08/09/2021) | Details CEM-3701 Report | |
| 210707 | Project ID: 210707 DEA: 040K1704 EFIS: 0416000057 | 04-SON-1-45.1 | Reconstruction portion of failed culvert | Near Stewarts Point at 2.7 miles south of Stewarts Point Skaggs Springs Road | 01/03/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 210850 | Project ID: 210850 Permit Numbers: 0714NMC0272 07156DP0545 | 07-LA-1-35.17/35.17 | Reconstuction of area above McClure Tunnel/Traffic signal/Lighting poles | Rte 1, Los Angeles | 07/31/2018 | 2 (09/30/2015) | Details CEM-3701 Report |
| 1000222 | Project ID: 1000222 DEA: 010M9204 EFIS: 0123000093 | 01-LAK-20-8.9/28.5 | RECTANGULAR RAPID FLASHING BEACON SYSTEM, & PAVEMENT MARKING. | LAKE COUNTY NEAR UPPER LAKE AND CLEARLAKE OAKS AT VARIOUS LOCATIONS FROM MAIN STREET TO BUTLER STREET | 06/16/2025 | 1 (04/05/2024) | Details CEM-3701 Report |
| 1000018 | Project ID: 1000018 DEA: 042Q7604 EFIS: 0419000046 | 04-ALA-238,680-0.7/0.8,M0.1 | RECTANGULAR RAPID FLASHING BEACON SYSTEMS, HMA, CURB RAMP AND SW. | ALAMEDA COUNTY IN FREMONT ON ROUTE 680 AT OFF-RAMP TO SCOTT CREEK ROAD AND ON ROUTE 238 AT MISSION BRIDGE COURT | 1 (01/08/2024) | Details CEM-3701 Report |
