Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12441-12450 of 18766 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4780 | Project ID: 4780 EFIS: 0000001155 Permit Numbers: 08096MC0441 | 08-RIV-74-29.8/29.8 | Enter onto SR 74 Right of Way at Menifee road to set up temporary traffic controls to perform street improvements within County of Riverside right of way, and to install traffic signal interconnect between the new county traffic signal at Menifee Road and | 28664 Matthews Rd (SR 74), Perris Valley | 12/09/2009 | 2 (12/09/2009) | Details CEM-3701 Report |
| 4692 | Project ID: 4692 EFIS: 0000001155 Permit Numbers: 0806NTN0502 | 08-SBD-60-4.8/4.8 | Enter onto Interstate 60 right-of-way at Sultana Ave. in the City of Ontario to install, own, operate and maintain approximate 330 LF of double 72″ diameter reinforced concrete pipe culvert crossing I-60 (by tunneling), as per plans and Special Provision | Sultana Ave. and SR-60, Ontario | 11/01/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 7021 | Project ID: 7021 EFIS: 0000001155 Permit Numbers: 0811NDP1045 | 08-SBD-215-13.8/14 | Enter onto Interstate 215 right-of-way west of Kendall Drive in the City of San Bernardino to construct Park & Ride Facility within State right-of-way as per plans and specifications date stamped June 28, 2011, per parent permit 08-11-N-MC-0449, and p | Kendall Drive, San Bernardino | 09/30/2012 | 2 (09/30/2012) | Details CEM-3701 Report |
| 5191 | Project ID: 5191 DEA: 110P3004 Permit Numbers: 0811NMC0449 | 08-SBD-215-13.8/14 | Enter onto Interstate 215 right-of-way west of Kendall Drive in the City of San Bernardino to construct Park & Ride Facility within State right-of-way as per plans and specifications date stamped June 28, 2011 by Department of Transportation, District | Kendall Drive, San Bernardino | 05/12/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 7069 | Project ID: 7069 DEA: 080P3004 EFIS: 0800001016 Permit Numbers: 0811NMC0449 | 08-SBD-215-13.8/14 | Enter onto Interstate 215 right-of-way west of Kendall Drive in the City of San Bernardino to construct Park & Ride Facility within State right-of-way as per plans and specifications date stamped June 28, 2011 by Department of Transportation | Kendall Drive, San Bernardino | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7509 | Project ID: 7509 EFIS: 0000001155 Permit Numbers: 0812NMC0462 | 08-RIV-215-14.2/28.5 | Enter onto Interstate 215 right-of-way between Scott Road and Nuevo Road, in the Cities of Menifee and Perris, to widen the freeway to six lanes including but not limited to new roadway pavement, planting &; irrigation & amp; hydro seed work. | Interstate 215, Perris Menifee | 06/08/2014 | 1 (06/08/2014) | Details CEM-3701 Report |
| 208570 | Project ID: 208570 Permit Numbers: 0812NRW0863 0813NDP0060 0812NMC0462 | 08-RIV-215-16/28.5 | Enter onto Interstate 215 right-of-way between Scott Road and Neuvo Road, in the Cities of Menifee and Perris, to widen the freeway to six lanes for project EA 0F162 (Prom ID: 0800000116) including but not limited to new roadway pavement, planting & i | Interstate 215, Perris Menifee | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7515 | Project ID: 7515 DEA: 080E5204 EFIS: 0800000088 Permit Numbers: 0811NMC0804 0812NDP5204 | 08-RIV--R32.32/R35.95 | Enter onto Interstate 215 right-of-way at Van Buren Boulevard Interchange to reconstruct the interchange including but not limited to realign freeway ramps, replace overcrossing and overhead bridges, construct retaining walls, drainage facilities, signal | Near the city of Riverside, on Interstate 215 at Van Buren Boulevard | 10/26/2012 | 1 (09/03/2012) | Details CEM-3701 Report |
| 6940 | Project ID: 6940 DEA: 080G9804 EFIS: 0800000235 Permit Numbers: 0811NDP0884 | 08-RIV-215-30.8/31.1 | Enter onto Interstate 215 right-of-way at Ramona Expressway near Perris area, to widen the southbound and northbound off-ramps and overcrossing bridge including the construction of a retaining wall, new traffic signals, landscape . | Interstate 215,Perris | 02/16/2013 | 1 (02/16/2013) | Details CEM-3701 Report |
| 5193 | Project ID: 5193 EFIS: 0000001155 Permit Numbers: 0811NMC0572 | 08-RIV-215-30.8/31.1 | Enter onto Interstate 215 right-of-way at Ramona Expressway near Perris area, to widen the southbound & northbound off-ramps and overcrossing bridge including the construction of a retaining wall, new traffic signals, landscape and an additional left- | Interstate 215 , Perris | 02/16/2013 | 1 (02/16/2013) | Details CEM-3701 Report |
