Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12431-12440 of 19515 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7218 | Project ID: 7218 EFIS: 0000001155 Permit Numbers: 04126DP0070 | 04-SON-12-PM 38.06-PM 38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Br | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 7217 | Project ID: 7217 EFIS: 1200000372 MINOR: 12A1379 | 12-ORA-39- | Upgrade Lighting | 09/30/2014 | 1 (03/26/2013) | Details CEM-3701 Report | |
| 7216 | Project ID: 7216 DEA: 073P3304 EFIS: 0700020180 MINOR: 07A3286 | 07-LA-213-6.75/6.88 | Construct and improve sidewalk | City of Torrance form 234st and GX-ATSF Railroad Crossing | 1 (01/14/2013) | Details CEM-3701 Report | |
| 7214 | Project ID: 7214 DEA: 08464624 EFIS: 0800001042 Permit Numbers: 0812NMC0088 | 08-RIV-79-R13.5/R19.2,R24.0/R24.4 | Enter onto State right-of-way to widen State Route 79/Winchester Road from Abelia Street (PM 10.40) to 250 m north of Scott Road (PM 12.24) and widening from 355 m south of Newport Road to Newport Road (PM 15.15). Modified signal and lighting plans for Ab | State Route 79/Winchester Road, Riverside County | 08/25/2021 | 1 (03/26/2013) | Details CEM-3701 Report |
| 7213 | Project ID: 7213 EFIS: 0000001155 Permit Numbers: 0511NMC0117 | 05-SLO-101-5.9/6.9 | Willow Road Interchange Improvement per Cooperative Agreement | 0.9 mile North of Tefft Street, Nipomo | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7212 | Project ID: 7212 DEA: 05474504 EFIS: 0000001155 Permit Numbers: 0511NDP0121 | 05-SLO-101-5.9/6.9 | Willow Road Interchange Improvement | 0.9 mile North of Tefft Street, Nipomo | 11/11/2019 | 2 (11/11/2019) | Details CEM-3701 Report |
| 7211 | Project ID: 7211 DEA: 112M3904 EFIS: 1100020411 | 11-SD-76-L0.0/M2.9 | COLD PLANE AND OVERLAY WITH RHMA, SIGNAL AND LIGHTING WORK. | SAN DIEGO COUNTY IN OCEANSIDE FROM 0.1 WEST OF ROUTE 5/76 SEPARATION TO MISSION AVENUE UNDERCROSSING | 10/04/2012 | 1 (10/30/2012) | Details CEM-3701 Report |
| 7210 | Project ID: 7210 DEA: 100V9804 | 10-MPA-49-R34.6/48.8 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA (GAP GRADED). | MARIPOSA COUNTY AT AND NEAR COULTERVILLE FROM MERCED RIVER BRIDGE TO TUOLUMNE COUNTY LINE | 01/04/2013 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7209 | Project ID: 7209 DEA: 100U6204 | 10-MER-5-16.7 | BRIDGE COLUMN TO BE REPAIRED. | MERCED COUNTY NEAR SANTA NELLA AT BILLY WRIGHT ROAD UNDERCROSSING | 01/04/2013 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7208 | Project ID: 7208 DEA: 080P8504 EFIS: 0800020037 | 08-SBD,RIV-60,215-Var | REHABILITATE PAVEMENT | SAN BERNARDINO AND RIVERSIDE COUNTIES ON ROUTE 60 FROM LOS ANGELES COUNTY LINE TO ROUTE 60/91/215 SEPARATION AND ON ROUTE 215 FROM MARTIN LUTHER KING BOULEVARD UNDERCROSSING TO ROUTE 60/91/215 SEPARATION | 10/30/2012 | 1 (06/27/2012) | Details CEM-3701 Report |
